YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Parameter Preferences for Length Detection of Reinforcement Cage in Bored Pile

    Source: Journal of Performance of Constructed Facilities:;2020:;Volume ( 034 ):;issue: 002
    Author:
    Maoxin Su
    ,
    Ying Zhao
    ,
    Shucai Li
    ,
    Yiguo Xue
    ,
    Daohong Qiu
    ,
    Peng Wang
    ,
    Fanmeng Kong
    ,
    Teng Xia
    DOI: 10.1061/(ASCE)CF.1943-5509.0001386
    Publisher: ASCE
    Abstract: Reinforcement cage length has a significant impact on the bearing capacity of bored piles. Accurate measurement of the cage length provides an important guideline for judging pile quality. Currently, the electric method has been widely used in detecting reinforcement cage length. However, the precision of detection results requires further improvements. This paper presents an electric potential difference method for length detection based on theoretical analyses and formula derivations. Against the numerical calculation it can be observed that detection accuracy increased along with increases in the actual skeleton length and decrease of the pile-to-borehole distance, electrode spacing, and moving step size of electrodes. Parameter preferences of length detection were recommended as follows: (1) the electric potential difference method was recommended to complete the detection when the designed length of the pile was more than 8 m; (2) the pile-to-borehole distance was suggested to be less than one-fifth of the designed cage length; (3) the electrode spacing should be no more than a hundredth of the designed cage length; (4) the moving step size was limited to less than one-tenth of the designed skeleton length, and the length was an integral multiple of the step size. Moreover, the results and recommendations were verified by physical model experiments and engineering practices.
    • Download: (1.985Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Parameter Preferences for Length Detection of Reinforcement Cage in Bored Pile

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4265008
    Collections
    • Journal of Performance of Constructed Facilities

    Show full item record

    contributor authorMaoxin Su
    contributor authorYing Zhao
    contributor authorShucai Li
    contributor authorYiguo Xue
    contributor authorDaohong Qiu
    contributor authorPeng Wang
    contributor authorFanmeng Kong
    contributor authorTeng Xia
    date accessioned2022-01-30T19:17:29Z
    date available2022-01-30T19:17:29Z
    date issued2020
    identifier other%28ASCE%29CF.1943-5509.0001386.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4265008
    description abstractReinforcement cage length has a significant impact on the bearing capacity of bored piles. Accurate measurement of the cage length provides an important guideline for judging pile quality. Currently, the electric method has been widely used in detecting reinforcement cage length. However, the precision of detection results requires further improvements. This paper presents an electric potential difference method for length detection based on theoretical analyses and formula derivations. Against the numerical calculation it can be observed that detection accuracy increased along with increases in the actual skeleton length and decrease of the pile-to-borehole distance, electrode spacing, and moving step size of electrodes. Parameter preferences of length detection were recommended as follows: (1) the electric potential difference method was recommended to complete the detection when the designed length of the pile was more than 8 m; (2) the pile-to-borehole distance was suggested to be less than one-fifth of the designed cage length; (3) the electrode spacing should be no more than a hundredth of the designed cage length; (4) the moving step size was limited to less than one-tenth of the designed skeleton length, and the length was an integral multiple of the step size. Moreover, the results and recommendations were verified by physical model experiments and engineering practices.
    publisherASCE
    titleParameter Preferences for Length Detection of Reinforcement Cage in Bored Pile
    typeJournal Paper
    journal volume34
    journal issue2
    journal titleJournal of Performance of Constructed Facilities
    identifier doi10.1061/(ASCE)CF.1943-5509.0001386
    page04020002
    treeJournal of Performance of Constructed Facilities:;2020:;Volume ( 034 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian