YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Failure Mechanism of Primary Support for a Shallow and Asymmetrically Loaded Tunnel Portal and Treatment Measures

    Source: Journal of Performance of Constructed Facilities:;2020:;Volume ( 034 ):;issue: 001
    Author:
    Chao Yang
    ,
    Zhangxin Hu
    ,
    Da Huang
    ,
    Fei Guo
    DOI: 10.1061/(ASCE)CF.1943-5509.0001385
    Publisher: ASCE
    Abstract: Shallow and asymmetrically loaded tunnels are very common in mountain tunnel portals, and localized excessive deformation, cracking, or even collapse often occur during the construction process. In this study, a shallow and asymmetrically loaded tunnel entrance is used as an example to discuss the primary support failure mechanism by means of field observations and monitoring and three-dimensional (3D) numerical simulation. Asymmetrical loading, rainfall, and mismanagement were the three main triggers of failure events. The continuous rainfall infiltration significantly reduced the quality of the surrounding rock, resulting in an increase in the initially high asymmetrical loading. The retaining wall and surrounding rock failed to provide sufficient counterpressure on the shallowly buried side, leading to large deformation of the primary support at the beginning of excavation. The deformation increased continuously and quickly exceeded the allowable value; however, the project was not stopped in time, and further excavation occurred due to a communication failure between the monitoring and construction crews. Thus, severe damage to the primary support occurred when the tunnel face reached a distance of 24 m from the entrance. To avoid more hazardous damage, a temporary support mainly composed of 20b I-steel was installed immediately to prevent deformation; 30 days later, a cutting slope was created on the deeply buried side to reduce the asymmetrical loading, and the excavated rock mass was stacked at the shallow buried side to increase the counterpressure. Then, the temporary support was removed, and a secondary lining was applied in a timely fashion. The monitoring data showed that good results had been achieved. This study provides useful recommendations for the construction safety of shallow and asymmetrically loaded tunnel portals.
    • Download: (3.441Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Failure Mechanism of Primary Support for a Shallow and Asymmetrically Loaded Tunnel Portal and Treatment Measures

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4264996
    Collections
    • Journal of Performance of Constructed Facilities

    Show full item record

    contributor authorChao Yang
    contributor authorZhangxin Hu
    contributor authorDa Huang
    contributor authorFei Guo
    date accessioned2022-01-30T19:17:11Z
    date available2022-01-30T19:17:11Z
    date issued2020
    identifier other%28ASCE%29CF.1943-5509.0001385.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4264996
    description abstractShallow and asymmetrically loaded tunnels are very common in mountain tunnel portals, and localized excessive deformation, cracking, or even collapse often occur during the construction process. In this study, a shallow and asymmetrically loaded tunnel entrance is used as an example to discuss the primary support failure mechanism by means of field observations and monitoring and three-dimensional (3D) numerical simulation. Asymmetrical loading, rainfall, and mismanagement were the three main triggers of failure events. The continuous rainfall infiltration significantly reduced the quality of the surrounding rock, resulting in an increase in the initially high asymmetrical loading. The retaining wall and surrounding rock failed to provide sufficient counterpressure on the shallowly buried side, leading to large deformation of the primary support at the beginning of excavation. The deformation increased continuously and quickly exceeded the allowable value; however, the project was not stopped in time, and further excavation occurred due to a communication failure between the monitoring and construction crews. Thus, severe damage to the primary support occurred when the tunnel face reached a distance of 24 m from the entrance. To avoid more hazardous damage, a temporary support mainly composed of 20b I-steel was installed immediately to prevent deformation; 30 days later, a cutting slope was created on the deeply buried side to reduce the asymmetrical loading, and the excavated rock mass was stacked at the shallow buried side to increase the counterpressure. Then, the temporary support was removed, and a secondary lining was applied in a timely fashion. The monitoring data showed that good results had been achieved. This study provides useful recommendations for the construction safety of shallow and asymmetrically loaded tunnel portals.
    publisherASCE
    titleFailure Mechanism of Primary Support for a Shallow and Asymmetrically Loaded Tunnel Portal and Treatment Measures
    typeJournal Paper
    journal volume34
    journal issue1
    journal titleJournal of Performance of Constructed Facilities
    identifier doi10.1061/(ASCE)CF.1943-5509.0001385
    page04019105
    treeJournal of Performance of Constructed Facilities:;2020:;Volume ( 034 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian