YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Effect of Change Orders on Cost and Schedule for Small Low-Bid Highway Contracts

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2019:;Volume ( 011 ):;issue: 004
    Author:
    Pramen P. Shrestha
    ,
    Ruiko Maharjan
    DOI: 10.1061/(ASCE)LA.1943-4170.0000323
    Publisher: American Society of Civil Engineers
    Abstract: For design-bid-build (DBB) projects, the assumption is that because the bid cost of the lowest bidder is usually below the estimated cost of the project, change orders during construction will increase. This study collected data on 615 small highway DBB projects (with costs of less than $1 million) from the Florida DOT (FDOT) related to the construction of roads and structures, and determined the correlation between these two variables. The study determined whether change orders affected cost and schedule performance; for projects that had no change orders or negative change orders, cost and schedule performance were significantly better than for of projects that had positive change orders. The results of this study demonstrate that projects that had positive change orders were those in which the contractors submitted bids significantly higher than those submitted for projects that had no change orders or negative change orders, even though—in both groups—the bids were lower than the estimated costs. An in-depth analysis showed that the projects that had no change orders or negative change orders had significantly lower cost and schedule growth as well as higher construction intensity compared to those of projects that had positive change orders. These results indicate that change orders have detrimental effects on cost and schedule growth, as well as construction intensity in small highway projects. The researchers recommend using a change order management process in order to reduce the effects of change orders on project costs and schedule performance. The researchers also recommend conducting a similar study with the data of all state DOTs in order to test whether the effect of change orders on cost and schedule performance of highway projects is similar to this study. The major contributions of this study to the body of knowledge are that the low bid had no effect on change orders, and positive change orders increased the cost and schedule growth as well as decreased the construction intensity of the small highway projects.
    • Download: (586.7Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Effect of Change Orders on Cost and Schedule for Small Low-Bid Highway Contracts

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4260644
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorPramen P. Shrestha
    contributor authorRuiko Maharjan
    date accessioned2019-09-18T10:43:00Z
    date available2019-09-18T10:43:00Z
    date issued2019
    identifier other%28ASCE%29LA.1943-4170.0000323.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4260644
    description abstractFor design-bid-build (DBB) projects, the assumption is that because the bid cost of the lowest bidder is usually below the estimated cost of the project, change orders during construction will increase. This study collected data on 615 small highway DBB projects (with costs of less than $1 million) from the Florida DOT (FDOT) related to the construction of roads and structures, and determined the correlation between these two variables. The study determined whether change orders affected cost and schedule performance; for projects that had no change orders or negative change orders, cost and schedule performance were significantly better than for of projects that had positive change orders. The results of this study demonstrate that projects that had positive change orders were those in which the contractors submitted bids significantly higher than those submitted for projects that had no change orders or negative change orders, even though—in both groups—the bids were lower than the estimated costs. An in-depth analysis showed that the projects that had no change orders or negative change orders had significantly lower cost and schedule growth as well as higher construction intensity compared to those of projects that had positive change orders. These results indicate that change orders have detrimental effects on cost and schedule growth, as well as construction intensity in small highway projects. The researchers recommend using a change order management process in order to reduce the effects of change orders on project costs and schedule performance. The researchers also recommend conducting a similar study with the data of all state DOTs in order to test whether the effect of change orders on cost and schedule performance of highway projects is similar to this study. The major contributions of this study to the body of knowledge are that the low bid had no effect on change orders, and positive change orders increased the cost and schedule growth as well as decreased the construction intensity of the small highway projects.
    publisherAmerican Society of Civil Engineers
    titleEffect of Change Orders on Cost and Schedule for Small Low-Bid Highway Contracts
    typeJournal Paper
    journal volume11
    journal issue4
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/(ASCE)LA.1943-4170.0000323
    page04519025
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2019:;Volume ( 011 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian