YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Administration of Construction Contract Interim Payments Based on Earned-Value Reduction Techniques

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2019:;Volume ( 011 ):;issue: 004
    Author:
    Farah S. Demachkieh
    ,
    Mohamed-Asem U. Abdul-Malak
    DOI: 10.1061/(ASCE)LA.1943-4170.0000309
    Publisher: American Society of Civil Engineers
    Abstract: Progress payment valuations and certifications represent a core construction contract administration function. If not attended to by the concerned contract administrators in accordance with prescribed provisions and in good faith, this vital function could end up being the seed for disputes to arise between contractors and owners. There are many reasons why work considered to have been accomplished by contractors ends up being denied certification by the contract engineer, thereby leading to the deferral of receipt, if not partial or full denial, of payment to the contractor. The aim of this paper is to address the conditions that could trigger potential withholding or setting off by the engineer of amounts that are otherwise viewed as due by the contractor. The adopted methodology includes (1) identifying of well-researched earned-value reduction methods, (2) investigating a suitable approach for incorporating them into the process of interim-payment certification, and (3) providing a proposed framework under which the application of such warranted earned-value reductions can be exercised in a fair and transparent manner. The research findings revealed several reasons that can be regarded as justifying the effectuating of reductions by the engineer, including quality of executed work, potential rework caused by the violation of the planned work execution sequence, and the inability to transfer the performed work to internal schedule’s customers.
    • Download: (1.486Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Administration of Construction Contract Interim Payments Based on Earned-Value Reduction Techniques

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4260632
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorFarah S. Demachkieh
    contributor authorMohamed-Asem U. Abdul-Malak
    date accessioned2019-09-18T10:42:57Z
    date available2019-09-18T10:42:57Z
    date issued2019
    identifier other%28ASCE%29LA.1943-4170.0000309.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4260632
    description abstractProgress payment valuations and certifications represent a core construction contract administration function. If not attended to by the concerned contract administrators in accordance with prescribed provisions and in good faith, this vital function could end up being the seed for disputes to arise between contractors and owners. There are many reasons why work considered to have been accomplished by contractors ends up being denied certification by the contract engineer, thereby leading to the deferral of receipt, if not partial or full denial, of payment to the contractor. The aim of this paper is to address the conditions that could trigger potential withholding or setting off by the engineer of amounts that are otherwise viewed as due by the contractor. The adopted methodology includes (1) identifying of well-researched earned-value reduction methods, (2) investigating a suitable approach for incorporating them into the process of interim-payment certification, and (3) providing a proposed framework under which the application of such warranted earned-value reductions can be exercised in a fair and transparent manner. The research findings revealed several reasons that can be regarded as justifying the effectuating of reductions by the engineer, including quality of executed work, potential rework caused by the violation of the planned work execution sequence, and the inability to transfer the performed work to internal schedule’s customers.
    publisherAmerican Society of Civil Engineers
    titleAdministration of Construction Contract Interim Payments Based on Earned-Value Reduction Techniques
    typeJournal Paper
    journal volume11
    journal issue4
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/(ASCE)LA.1943-4170.0000309
    page04519023
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2019:;Volume ( 011 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian