YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Pros and Cons of Using Building Information Modeling in the AEC Industry

    Source: Journal of Construction Engineering and Management:;2019:;Volume ( 145 ):;issue: 008
    Author:
    Senem Seyis
    DOI: 10.1061/(ASCE)CO.1943-7862.0001681
    Publisher: American Society of Civil Engineers
    Abstract: Although a plethora of studies on building information modeling (BIM) have been conducted in the last decade, none of the previous studies collate and/or prioritize the benefits, risks, and challenges of BIM based on the data collected from a comprehensive literature review and subject matter experts (SMEs). In order to allow architecture, engineering, and construction (AEC) professionals and academics see the true potential of BIM in a wider context and help them understand its multiorganizational and multidisciplinary functions, there is an obvious necessity for identifying, classifying, and prioritizing the pros and cons of BIM; however, such a study is still currently absent in the AEC literature. The aim of this study is to identify, classify, and rank the pros and cons of BIM that address the benefits, challenges, and risks of BIM in the transition from computer-aided design (CAD). A literature review was performed and face-to-face semistructured interviews with SMEs on BIM were conducted for identification and classification purposes. A total of 41 types of benefits, 11 types of risks, and 13 types of challenges of BIM were identified via triangulation of literature review and face-to-face semistructured interviews with SMEs. The Delphi method was performed for prioritizing the benefits of BIM in terms of time, cost, and sustainability as well as the risks and challenges of BIM encountered in the transition process from CAD to BIM. The interrater agreement and significance-level statistics were performed to analyze and validate the consensus reached by the Delphi panel experts. This paper contributes to the existing body of knowledge on BIM by providing comprehensive identification and classification of the benefits, challenges, and risks of BIM, and prioritization of the benefits for BIM in terms of time, cost, and sustainability as well as the risks and challenges of BIM. The priority rankings of benefits, risks, and challenges of BIM ensure successful completion of projects and create additional value by allowing professionals to make well-informed decisions that support decreasing time and cost-related waste in the transition process from CAD to BIM.
    • Download: (176.5Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Pros and Cons of Using Building Information Modeling in the AEC Industry

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4260095
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorSenem Seyis
    date accessioned2019-09-18T10:40:22Z
    date available2019-09-18T10:40:22Z
    date issued2019
    identifier other%28ASCE%29CO.1943-7862.0001681.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4260095
    description abstractAlthough a plethora of studies on building information modeling (BIM) have been conducted in the last decade, none of the previous studies collate and/or prioritize the benefits, risks, and challenges of BIM based on the data collected from a comprehensive literature review and subject matter experts (SMEs). In order to allow architecture, engineering, and construction (AEC) professionals and academics see the true potential of BIM in a wider context and help them understand its multiorganizational and multidisciplinary functions, there is an obvious necessity for identifying, classifying, and prioritizing the pros and cons of BIM; however, such a study is still currently absent in the AEC literature. The aim of this study is to identify, classify, and rank the pros and cons of BIM that address the benefits, challenges, and risks of BIM in the transition from computer-aided design (CAD). A literature review was performed and face-to-face semistructured interviews with SMEs on BIM were conducted for identification and classification purposes. A total of 41 types of benefits, 11 types of risks, and 13 types of challenges of BIM were identified via triangulation of literature review and face-to-face semistructured interviews with SMEs. The Delphi method was performed for prioritizing the benefits of BIM in terms of time, cost, and sustainability as well as the risks and challenges of BIM encountered in the transition process from CAD to BIM. The interrater agreement and significance-level statistics were performed to analyze and validate the consensus reached by the Delphi panel experts. This paper contributes to the existing body of knowledge on BIM by providing comprehensive identification and classification of the benefits, challenges, and risks of BIM, and prioritization of the benefits for BIM in terms of time, cost, and sustainability as well as the risks and challenges of BIM. The priority rankings of benefits, risks, and challenges of BIM ensure successful completion of projects and create additional value by allowing professionals to make well-informed decisions that support decreasing time and cost-related waste in the transition process from CAD to BIM.
    publisherAmerican Society of Civil Engineers
    titlePros and Cons of Using Building Information Modeling in the AEC Industry
    typeJournal Paper
    journal volume145
    journal issue8
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0001681
    page04019046
    treeJournal of Construction Engineering and Management:;2019:;Volume ( 145 ):;issue: 008
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian