YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Simulation of a Construction Project: Assessing Impact of Just-in-Time and Lean Principles

    Source: Journal of Construction Engineering and Management:;2019:;Volume ( 145 ):;issue: 005
    Author:
    Flora Bamana
    ,
    Nadia Lehoux
    ,
    Caroline Cloutier
    DOI: 10.1061/(ASCE)CO.1943-7862.0001654
    Publisher: American Society of Civil Engineers
    Abstract: The construction industry is always searching for better ways to manage construction projects and improve productivity while leaving a smaller ecological footprint. To help with this goal, a simulation model was developed in a 3D simulation modeling framework to examine the impact of successful concepts from the manufacturing industry, such as just-in-time (JIT) deliveries, Lean tools, and prefabrication in construction. The model developed was based on a real 6-story wooden building erected in the province of Quebec, Canada. Through a design of experiment, results of the simulation showed the impact of each concept and their interactions on the construction duration, shortages, and labor utilization. They also put into light the quantitative advantages and disadvantages of implementing 0%, 50%, or 100% Lean management methods, keeping between 1 and 4 days of buffer stock on the construction site, having 80% or 100% prefabrication of components, and using 1 or 2 construction teams. As a result, this paper contributes to the work of scholars and practitioners by simulating a real construction project to assess the impact of prefabrication, JIT, and Lean principles with tangible metrics, construction duration, shortages, and labor utilization.
    • Download: (1.360Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Simulation of a Construction Project: Assessing Impact of Just-in-Time and Lean Principles

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4260021
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorFlora Bamana
    contributor authorNadia Lehoux
    contributor authorCaroline Cloutier
    date accessioned2019-09-18T10:40:03Z
    date available2019-09-18T10:40:03Z
    date issued2019
    identifier other%28ASCE%29CO.1943-7862.0001654.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4260021
    description abstractThe construction industry is always searching for better ways to manage construction projects and improve productivity while leaving a smaller ecological footprint. To help with this goal, a simulation model was developed in a 3D simulation modeling framework to examine the impact of successful concepts from the manufacturing industry, such as just-in-time (JIT) deliveries, Lean tools, and prefabrication in construction. The model developed was based on a real 6-story wooden building erected in the province of Quebec, Canada. Through a design of experiment, results of the simulation showed the impact of each concept and their interactions on the construction duration, shortages, and labor utilization. They also put into light the quantitative advantages and disadvantages of implementing 0%, 50%, or 100% Lean management methods, keeping between 1 and 4 days of buffer stock on the construction site, having 80% or 100% prefabrication of components, and using 1 or 2 construction teams. As a result, this paper contributes to the work of scholars and practitioners by simulating a real construction project to assess the impact of prefabrication, JIT, and Lean principles with tangible metrics, construction duration, shortages, and labor utilization.
    publisherAmerican Society of Civil Engineers
    titleSimulation of a Construction Project: Assessing Impact of Just-in-Time and Lean Principles
    typeJournal Paper
    journal volume145
    journal issue5
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0001654
    page05019005
    treeJournal of Construction Engineering and Management:;2019:;Volume ( 145 ):;issue: 005
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian