YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Bridge Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Bridge Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Accelerated Construction of Self-Anchored Suspension Bridge Using Novel Tower-Girder Anchorage Technique

    Source: Journal of Bridge Engineering:;2019:;Volume ( 024 ):;issue: 005
    Author:
    Xiaoming Wang
    ,
    Pengbo Fei
    ,
    You Dong
    ,
    Chengshu Wang
    DOI: 10.1061/(ASCE)BE.1943-5592.0001383
    Publisher: American Society of Civil Engineers
    Abstract: The traditional construction methods (e.g., erecting cable after girder) of the self-anchored suspension bridge can interrupt traffic during the construction stage due to the installation of temporary supports. That severely limits the wide application of this type of bridge. Thus, this study proposes a novel tower-girder anchorage (TGA) technique for accelerated construction of self-anchored suspension bridges. By using the proposed TGA technique, the midspan girder segments are hoisted and connected to the hangers, which subsequently avoids the interruption of traffic during the construction period. The proposed TGA technique would reduce the construction cost, time of erection, and demolition of temporary scaffolds. To ensure structural safety and performance during the proposed construction process, the force transfer mechanism and construction process of the TGA technique are assessed. To this end, the devices for the TGA technique and system transformation are designed. The constructability of the TGA technique on accelerated bridge construction is evaluated by a real-world application: Dongtiao River Bridge in China. A finite-element model is established to analyze the construction process. Simulation analysis and field test data are compared. The comparison demonstrates that the TGA technique can safely and economically achieve accelerated construction of self-anchored suspension bridges.
    • Download: (3.003Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Accelerated Construction of Self-Anchored Suspension Bridge Using Novel Tower-Girder Anchorage Technique

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4259865
    Collections
    • Journal of Bridge Engineering

    Show full item record

    contributor authorXiaoming Wang
    contributor authorPengbo Fei
    contributor authorYou Dong
    contributor authorChengshu Wang
    date accessioned2019-09-18T10:39:16Z
    date available2019-09-18T10:39:16Z
    date issued2019
    identifier other%28ASCE%29BE.1943-5592.0001383.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4259865
    description abstractThe traditional construction methods (e.g., erecting cable after girder) of the self-anchored suspension bridge can interrupt traffic during the construction stage due to the installation of temporary supports. That severely limits the wide application of this type of bridge. Thus, this study proposes a novel tower-girder anchorage (TGA) technique for accelerated construction of self-anchored suspension bridges. By using the proposed TGA technique, the midspan girder segments are hoisted and connected to the hangers, which subsequently avoids the interruption of traffic during the construction period. The proposed TGA technique would reduce the construction cost, time of erection, and demolition of temporary scaffolds. To ensure structural safety and performance during the proposed construction process, the force transfer mechanism and construction process of the TGA technique are assessed. To this end, the devices for the TGA technique and system transformation are designed. The constructability of the TGA technique on accelerated bridge construction is evaluated by a real-world application: Dongtiao River Bridge in China. A finite-element model is established to analyze the construction process. Simulation analysis and field test data are compared. The comparison demonstrates that the TGA technique can safely and economically achieve accelerated construction of self-anchored suspension bridges.
    publisherAmerican Society of Civil Engineers
    titleAccelerated Construction of Self-Anchored Suspension Bridge Using Novel Tower-Girder Anchorage Technique
    typeJournal Paper
    journal volume24
    journal issue5
    journal titleJournal of Bridge Engineering
    identifier doi10.1061/(ASCE)BE.1943-5592.0001383
    page05019006
    treeJournal of Bridge Engineering:;2019:;Volume ( 024 ):;issue: 005
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian