YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Bridge Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Bridge Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Foundation Reuse in Accelerated Bridge Construction

    Source: Journal of Bridge Engineering:;2019:;Volume ( 024 ):;issue: 010
    Author:
    Nathan T. Davis
    ,
    Ehssan Hoomaan
    ,
    Anil K. Agrawal
    ,
    Masoud Sanayei
    ,
    Farrokh “Frank” Jalinoos
    DOI: 10.1061/(ASCE)BE.1943-5592.0001455
    Publisher: American Society of Civil Engineers
    Abstract: When an existing bridge is being considered for replacement due to a deteriorated or obsolete superstructure, the foundation may still have significant functional value. Reuse of these foundations during bridge replacement or widening can present significant cost and time savings over constructing new elements. The potential time savings associated with foundation reuse can reduce mobility impacts, a key goal of accelerated bridge construction (ABC), and the cost savings can increase the economic viability and sustainability of an ABC bridge replacement project. However, existing foundations may have uncertain material properties, geometry, or details that impact the risks associated with reuse. Unlike a new foundation, an existing foundation may have been damaged, may not have sufficient capacity, and may have limited remaining service life due to deterioration. Assessment of these issues, possible foundation-strengthening measures, and innovative approaches to optimize loading are discussed in this paper. An analysis of an ABC database is performed to examine the current role of foundation reuse in ABC projects. This paper presents some key findings identified through various research projects related to foundation reuse. Six case examples are presented in which foundations were reused or considered for reuse during a bridge replacement project.
    • Download: (4.114Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Foundation Reuse in Accelerated Bridge Construction

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4259613
    Collections
    • Journal of Bridge Engineering

    Show full item record

    contributor authorNathan T. Davis
    contributor authorEhssan Hoomaan
    contributor authorAnil K. Agrawal
    contributor authorMasoud Sanayei
    contributor authorFarrokh “Frank” Jalinoos
    date accessioned2019-09-18T10:38:01Z
    date available2019-09-18T10:38:01Z
    date issued2019
    identifier other%28ASCE%29BE.1943-5592.0001455.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4259613
    description abstractWhen an existing bridge is being considered for replacement due to a deteriorated or obsolete superstructure, the foundation may still have significant functional value. Reuse of these foundations during bridge replacement or widening can present significant cost and time savings over constructing new elements. The potential time savings associated with foundation reuse can reduce mobility impacts, a key goal of accelerated bridge construction (ABC), and the cost savings can increase the economic viability and sustainability of an ABC bridge replacement project. However, existing foundations may have uncertain material properties, geometry, or details that impact the risks associated with reuse. Unlike a new foundation, an existing foundation may have been damaged, may not have sufficient capacity, and may have limited remaining service life due to deterioration. Assessment of these issues, possible foundation-strengthening measures, and innovative approaches to optimize loading are discussed in this paper. An analysis of an ABC database is performed to examine the current role of foundation reuse in ABC projects. This paper presents some key findings identified through various research projects related to foundation reuse. Six case examples are presented in which foundations were reused or considered for reuse during a bridge replacement project.
    publisherAmerican Society of Civil Engineers
    titleFoundation Reuse in Accelerated Bridge Construction
    typeJournal Paper
    journal volume24
    journal issue10
    journal titleJournal of Bridge Engineering
    identifier doi10.1061/(ASCE)BE.1943-5592.0001455
    page05019010
    treeJournal of Bridge Engineering:;2019:;Volume ( 024 ):;issue: 010
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian