YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Enhancing Subcontractors' Participation in BIM-Based Design Coordination under a DBB Contract

    Source: Journal of Management in Engineering:;2019:;Volume ( 035 ):;issue: 006
    Author:
    Sejun Jang
    ,
    Yeonsuk Jeong
    ,
    Ghang Lee
    ,
    Youngcheol Kang
    DOI: 10.1061/(ASCE)ME.1943-5479.0000714
    Publisher: American Society of Civil Engineers
    Abstract: This paper introduces a two-step subcontracting process for building information modeling (BIM)–based design coordination under a design-bid-build (DBB) contract. Although integrated project delivery (IPD) is known to be an ideal contractual method for BIM projects, DBB still has been the dominant contracting method, owing to the complexity of IPD, as well as regional regulations. BIM-based design coordination under DBB can effectively reduce design errors through the value engineering process. However, in practice, the cost reduction realized under DBB is minimal because, unlike under IPD, DBB contracts do not provide incentives for subcontractors to reduce costs. This study proposes that subcontracting be divided into two phases: preconstruction and construction. Only subcontractors who meet the target costs during BIM-based design coordination in the preconstruction phase win the right to work during the construction phase. From case studies, this study finds quantitative cost reductions from this change in the preconstruction process. This study also reveals the manner in which this two-phase process impacts subcontractors' attitudes toward cost-reduction efforts. These findings contribute to maximizing the efficiency of BIM-based design coordination, which will eventually contribute to more efficient delivery of construction projects.
    • Download: (4.571Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Enhancing Subcontractors' Participation in BIM-Based Design Coordination under a DBB Contract

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4259340
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorSejun Jang
    contributor authorYeonsuk Jeong
    contributor authorGhang Lee
    contributor authorYoungcheol Kang
    date accessioned2019-09-18T10:36:35Z
    date available2019-09-18T10:36:35Z
    date issued2019
    identifier other%28ASCE%29ME.1943-5479.0000714.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4259340
    description abstractThis paper introduces a two-step subcontracting process for building information modeling (BIM)–based design coordination under a design-bid-build (DBB) contract. Although integrated project delivery (IPD) is known to be an ideal contractual method for BIM projects, DBB still has been the dominant contracting method, owing to the complexity of IPD, as well as regional regulations. BIM-based design coordination under DBB can effectively reduce design errors through the value engineering process. However, in practice, the cost reduction realized under DBB is minimal because, unlike under IPD, DBB contracts do not provide incentives for subcontractors to reduce costs. This study proposes that subcontracting be divided into two phases: preconstruction and construction. Only subcontractors who meet the target costs during BIM-based design coordination in the preconstruction phase win the right to work during the construction phase. From case studies, this study finds quantitative cost reductions from this change in the preconstruction process. This study also reveals the manner in which this two-phase process impacts subcontractors' attitudes toward cost-reduction efforts. These findings contribute to maximizing the efficiency of BIM-based design coordination, which will eventually contribute to more efficient delivery of construction projects.
    publisherAmerican Society of Civil Engineers
    titleEnhancing Subcontractors' Participation in BIM-Based Design Coordination under a DBB Contract
    typeJournal Paper
    journal volume35
    journal issue6
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)ME.1943-5479.0000714
    page04019022
    treeJournal of Management in Engineering:;2019:;Volume ( 035 ):;issue: 006
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian