YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Criticality of Construction Industry Problems in Developing Countries: Analyzing Malaysian Projects

    Source: Journal of Management in Engineering:;2019:;Volume ( 035 ):;issue: 005
    Author:
    Jeffrey Boon Hui Yap
    ,
    Ian Ni Chow
    ,
    Kamran Shavarebi
    DOI: 10.1061/(ASCE)ME.1943-5479.0000709
    Publisher: American Society of Civil Engineers
    Abstract: The problems facing the construction industry have hindered the progress and the development of this vital sector, particularly in developing countries. To investigate the salient issues, 23 widespread problems plaguing the global construction industry were first observed from a detailed literature review. A questionnaire was administered in Malaysia to solicit the viewpoints of 117 construction practitioners (clients, consultants, and contractors) to prioritize these problems appropriately according to the importance index, which also considered the frequency of occurrence and severity of the problems. The five most critical problems were ranked as follows: changes of design during construction, cost overruns, late completion, competitive tendering procedures, and late payment. Spearman's rank correlation tests affirmed the homogeneity of perceptions among the primary stakeholder groups. Next, a principal component analysis (PCA) manifested six major underlying dimensions of these problems, relating to a three-dimensional (3D) stigma, poor site coordination and management, incompetency of construction stakeholders, slow technology adoption, haphazard decision-making, and inefficient administrative processes. A comparison of the principal factors with other selected countries was performed for validation purposes. The results of this research can guide practitioners and researchers to focus on human- and management-related construction problems when devising strategic action plans to improve the construction industries of developing countries.
    • Download: (594.6Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Criticality of Construction Industry Problems in Developing Countries: Analyzing Malaysian Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4259338
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorJeffrey Boon Hui Yap
    contributor authorIan Ni Chow
    contributor authorKamran Shavarebi
    date accessioned2019-09-18T10:36:35Z
    date available2019-09-18T10:36:35Z
    date issued2019
    identifier other%28ASCE%29ME.1943-5479.0000709.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4259338
    description abstractThe problems facing the construction industry have hindered the progress and the development of this vital sector, particularly in developing countries. To investigate the salient issues, 23 widespread problems plaguing the global construction industry were first observed from a detailed literature review. A questionnaire was administered in Malaysia to solicit the viewpoints of 117 construction practitioners (clients, consultants, and contractors) to prioritize these problems appropriately according to the importance index, which also considered the frequency of occurrence and severity of the problems. The five most critical problems were ranked as follows: changes of design during construction, cost overruns, late completion, competitive tendering procedures, and late payment. Spearman's rank correlation tests affirmed the homogeneity of perceptions among the primary stakeholder groups. Next, a principal component analysis (PCA) manifested six major underlying dimensions of these problems, relating to a three-dimensional (3D) stigma, poor site coordination and management, incompetency of construction stakeholders, slow technology adoption, haphazard decision-making, and inefficient administrative processes. A comparison of the principal factors with other selected countries was performed for validation purposes. The results of this research can guide practitioners and researchers to focus on human- and management-related construction problems when devising strategic action plans to improve the construction industries of developing countries.
    publisherAmerican Society of Civil Engineers
    titleCriticality of Construction Industry Problems in Developing Countries: Analyzing Malaysian Projects
    typeJournal Paper
    journal volume35
    journal issue5
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)ME.1943-5479.0000709
    page04019020
    treeJournal of Management in Engineering:;2019:;Volume ( 035 ):;issue: 005
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian