YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Potential Obstacles to Successful Implementation of Public-Private Partnerships in Beijing and the Hong Kong Special Administrative Region

    Source: Journal of Management in Engineering:;2010:;Volume ( 026 ):;issue: 001
    Author:
    Albert P. C. Chan
    ,
    Patrick T. I. Lam
    ,
    Daniel W. M. Chan
    ,
    Esther Cheung
    ,
    Yongjian Ke
    DOI: 10.1061/(ASCE)0742-597X(2010)26:1(30)
    Publisher: American Society of Civil Engineers
    Abstract: Public-private partnership (PPP) has been practiced for quite some time around the world and there are numerous infrastructure, construction, and building projects which are employing the concepts. Unfortunately, not all of these PPP projects are equally successful and some of these projects have been exposed to formidable obstacles. The need to identify potential obstacles for PPP projects is therefore becoming an important issue for both research and practice. Despite the amount of interest vested in PPP, it is normally the advantages of PPP that are touched on rather than the potential obstacles. Both Beijing and the Hong Kong Special Administrative Region (referred to as Hong Kong from here onwards) have been keen to introduce more PPP projects. This paper presents part of the findings of an empirical questionnaire survey in relation to the prevailing barriers to PPP success conducted in these two administrative systems. It was anticipated that the obstacles would be similar for these jurisdictions. Respondents were asked to rate the level of severity of thirteen potential obstacles toward PPP projects identified from a literature review. The top three obstacles rated by the Beijing respondents were found to be “lengthy delays in negotiation,” “lack of experience and appropriate skills,” and “lengthy delays because of political debate.” Similarly the first and third obstacles ranked by the Beijing respondents were also ranked within top three by the Hong Kong respondents, together with “very few schemes have actually reached the contract stage (aborted before contract).” It was also discerned that “less employment positions,” “reduce the project accountability,” and “high project costs” were all ranked bottom by both of the Beijing and Hong Kong respondents. Moreover, the results obtained in the United Kingdom reported in other studies also shown consistency with those of Beijing and Hong Kong. Therefore the research hypothesis was proved to be true. Although the importance of the obstacles was similar it was realized that the scores obtained in the United Kingdom survey were much lower. This observation showed that the British respondents were less threatened by the obstacles, probably due to the fact that they are much more experienced and confident in undertaking PPP projects compared to Beijing and Hong Kong. Further analysis of the data reflected that the responses within each administrative system were consistent as revealed from the Kendall’s concordance analysis. Although the Spearman rank correlation test indicated that there was no significant disagreement on the rankings of obstacles between respondents of the two administrative systems, considerable difference was detected by the independent two-sample t-test in the mean value of their responses between the two administrative systems for the two obstacles lack of experience and appropriate skills and lengthy delays in negotiation. In Beijing, respondents felt that lack of experience and appropriate skills were highly important ranking it second place, but in Hong Kong this obstacle was ranked eighth, showing their confidence in experience and skills. For lengthy delays in negotiation, although the ranking between Beijing and Hong Kong was similar the difference in score showed a large variation. This represents a difference in tendering procedures between the two administrative regions. Triangulation with real cases largely supports the survey findings.
    • Download: (247.2Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Potential Obstacles to Successful Implementation of Public-Private Partnerships in Beijing and the Hong Kong Special Administrative Region

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/42559
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorAlbert P. C. Chan
    contributor authorPatrick T. I. Lam
    contributor authorDaniel W. M. Chan
    contributor authorEsther Cheung
    contributor authorYongjian Ke
    date accessioned2017-05-08T21:12:06Z
    date available2017-05-08T21:12:06Z
    date copyrightJanuary 2010
    date issued2010
    identifier other%28asce%290742-597x%282010%2926%3A1%2830%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/42559
    description abstractPublic-private partnership (PPP) has been practiced for quite some time around the world and there are numerous infrastructure, construction, and building projects which are employing the concepts. Unfortunately, not all of these PPP projects are equally successful and some of these projects have been exposed to formidable obstacles. The need to identify potential obstacles for PPP projects is therefore becoming an important issue for both research and practice. Despite the amount of interest vested in PPP, it is normally the advantages of PPP that are touched on rather than the potential obstacles. Both Beijing and the Hong Kong Special Administrative Region (referred to as Hong Kong from here onwards) have been keen to introduce more PPP projects. This paper presents part of the findings of an empirical questionnaire survey in relation to the prevailing barriers to PPP success conducted in these two administrative systems. It was anticipated that the obstacles would be similar for these jurisdictions. Respondents were asked to rate the level of severity of thirteen potential obstacles toward PPP projects identified from a literature review. The top three obstacles rated by the Beijing respondents were found to be “lengthy delays in negotiation,” “lack of experience and appropriate skills,” and “lengthy delays because of political debate.” Similarly the first and third obstacles ranked by the Beijing respondents were also ranked within top three by the Hong Kong respondents, together with “very few schemes have actually reached the contract stage (aborted before contract).” It was also discerned that “less employment positions,” “reduce the project accountability,” and “high project costs” were all ranked bottom by both of the Beijing and Hong Kong respondents. Moreover, the results obtained in the United Kingdom reported in other studies also shown consistency with those of Beijing and Hong Kong. Therefore the research hypothesis was proved to be true. Although the importance of the obstacles was similar it was realized that the scores obtained in the United Kingdom survey were much lower. This observation showed that the British respondents were less threatened by the obstacles, probably due to the fact that they are much more experienced and confident in undertaking PPP projects compared to Beijing and Hong Kong. Further analysis of the data reflected that the responses within each administrative system were consistent as revealed from the Kendall’s concordance analysis. Although the Spearman rank correlation test indicated that there was no significant disagreement on the rankings of obstacles between respondents of the two administrative systems, considerable difference was detected by the independent two-sample t-test in the mean value of their responses between the two administrative systems for the two obstacles lack of experience and appropriate skills and lengthy delays in negotiation. In Beijing, respondents felt that lack of experience and appropriate skills were highly important ranking it second place, but in Hong Kong this obstacle was ranked eighth, showing their confidence in experience and skills. For lengthy delays in negotiation, although the ranking between Beijing and Hong Kong was similar the difference in score showed a large variation. This represents a difference in tendering procedures between the two administrative regions. Triangulation with real cases largely supports the survey findings.
    publisherAmerican Society of Civil Engineers
    titlePotential Obstacles to Successful Implementation of Public-Private Partnerships in Beijing and the Hong Kong Special Administrative Region
    typeJournal Paper
    journal volume26
    journal issue1
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)0742-597X(2010)26:1(30)
    treeJournal of Management in Engineering:;2010:;Volume ( 026 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian