YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Partnering Process Model for Public-Sector Fast-Track Design-Build Projects in Korea

    Source: Journal of Management in Engineering:;2010:;Volume ( 026 ):;issue: 001
    Author:
    KyuMan Cho
    ,
    ChangTaek Hyun
    ,
    KyoJin Koo
    ,
    TaeHoon Hong
    DOI: 10.1061/(ASCE)0742-597X(2010)26:1(19)
    Publisher: American Society of Civil Engineers
    Abstract: The use of design-build project delivery in the public sector has increased rapidly since the early 1990s due to its advantages over traditional delivery methods, particularly in terms of shortening the overall project duration. Fast-track approaches are being applied to design-build projects to achieve the optimum schedule durations. While both fast-track projects and design-build project have been researched separately in the past, there is little published research on how they are truly integrated. Likewise, the research has shown the merits of partnering in design-build and fast-track projects separately, but not in an integrated model. The purpose of this study is to develop a fast-track partnering process model (FTPPM) that combines the fast-track approach with the partnering concept. The model is based on the analysis of the factors that influence successful fast-track processes. Seven key success vehicles were discovered using the factor analysis method. The FTPPM is composed of the preparation stage, the fast-track workshop stage, and the detailed design and construction stage. The activities for each stage for fast-track implementation are developed in consideration with seven key success vehicles for fast-track projects.
    • Download: (863.2Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Partnering Process Model for Public-Sector Fast-Track Design-Build Projects in Korea

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/42557
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorKyuMan Cho
    contributor authorChangTaek Hyun
    contributor authorKyoJin Koo
    contributor authorTaeHoon Hong
    date accessioned2017-05-08T21:12:06Z
    date available2017-05-08T21:12:06Z
    date copyrightJanuary 2010
    date issued2010
    identifier other%28asce%290742-597x%282010%2926%3A1%2819%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/42557
    description abstractThe use of design-build project delivery in the public sector has increased rapidly since the early 1990s due to its advantages over traditional delivery methods, particularly in terms of shortening the overall project duration. Fast-track approaches are being applied to design-build projects to achieve the optimum schedule durations. While both fast-track projects and design-build project have been researched separately in the past, there is little published research on how they are truly integrated. Likewise, the research has shown the merits of partnering in design-build and fast-track projects separately, but not in an integrated model. The purpose of this study is to develop a fast-track partnering process model (FTPPM) that combines the fast-track approach with the partnering concept. The model is based on the analysis of the factors that influence successful fast-track processes. Seven key success vehicles were discovered using the factor analysis method. The FTPPM is composed of the preparation stage, the fast-track workshop stage, and the detailed design and construction stage. The activities for each stage for fast-track implementation are developed in consideration with seven key success vehicles for fast-track projects.
    publisherAmerican Society of Civil Engineers
    titlePartnering Process Model for Public-Sector Fast-Track Design-Build Projects in Korea
    typeJournal Paper
    journal volume26
    journal issue1
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)0742-597X(2010)26:1(19)
    treeJournal of Management in Engineering:;2010:;Volume ( 026 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian