YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Modularization Business Case Analysis Model for Industrial Projects

    Source: Journal of Management in Engineering:;2019:;Volume ( 035 ):;issue: 003
    Author:
    Jin Ouk Choi; James T. O’Connor; Young Hoon Kwak; Binit K. Shrestha
    DOI: 10.1061/(ASCE)ME.1943-5479.0000683
    Publisher: American Society of Civil Engineers
    Abstract: Modularization is a method of enhancing project value by exporting a portion of the site work to fabrication/assembly shops or yards. However, the construction industry has difficulties in identifying the optimum extent of modularization to maximize its benefits. Research Team 283 of the Construction Industry Institute (CII) developed a business case process to identify the optimum proportion of work hours to be shifted off-site by means of a module scope and identified modularization drivers. With the assistance of the CII’s Modularization Community of Practice (MCOP), this study developed a model that provides the practitioner with specific savings in addition to finding the optimum level of work hours to be moved off-site. The researchers also collected existing business case analysis models/tools from various companies and the available literature to identify the most acceptable or best-fitting elements. These elements were integrated into the new model, which was reviewed and validated by CII MCOP. This model will be applicable to various projects where decision making for modularization is difficult because of the absence of an assigned cost/factor/productivity for different parts of a module job. This research will add to the already-existing literature and research on modular decision-making practices.
    • Download: (802.2Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Modularization Business Case Analysis Model for Industrial Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4255256
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorJin Ouk Choi; James T. O’Connor; Young Hoon Kwak; Binit K. Shrestha
    date accessioned2019-03-10T12:16:40Z
    date available2019-03-10T12:16:40Z
    date issued2019
    identifier other%28ASCE%29ME.1943-5479.0000683.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4255256
    description abstractModularization is a method of enhancing project value by exporting a portion of the site work to fabrication/assembly shops or yards. However, the construction industry has difficulties in identifying the optimum extent of modularization to maximize its benefits. Research Team 283 of the Construction Industry Institute (CII) developed a business case process to identify the optimum proportion of work hours to be shifted off-site by means of a module scope and identified modularization drivers. With the assistance of the CII’s Modularization Community of Practice (MCOP), this study developed a model that provides the practitioner with specific savings in addition to finding the optimum level of work hours to be moved off-site. The researchers also collected existing business case analysis models/tools from various companies and the available literature to identify the most acceptable or best-fitting elements. These elements were integrated into the new model, which was reviewed and validated by CII MCOP. This model will be applicable to various projects where decision making for modularization is difficult because of the absence of an assigned cost/factor/productivity for different parts of a module job. This research will add to the already-existing literature and research on modular decision-making practices.
    publisherAmerican Society of Civil Engineers
    titleModularization Business Case Analysis Model for Industrial Projects
    typeJournal Paper
    journal volume35
    journal issue3
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)ME.1943-5479.0000683
    page04019004
    treeJournal of Management in Engineering:;2019:;Volume ( 035 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian