YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Stakeholder-Associated Supply Chain Risks and Their Interactions in a Prefabricated Building Project in Hong Kong

    Source: Journal of Management in Engineering:;2019:;Volume ( 035 ):;issue: 002
    Author:
    Lizi Luo; Geoffrey Qiping Shen; Gangyan Xu; Yunlin Liu; Yingjie Wang
    DOI: 10.1061/(ASCE)ME.1943-5479.0000675
    Publisher: American Society of Civil Engineers
    Abstract: Prefabricated building projects (PBPs) have contributed significantly to addressing Hong Kong’s serious housing shortage and accommodate almost half of the residents in this densely populated city. The supply chains of PBPs involve large numbers of stakeholders, including clients, designers, main contractors, transporters, and assembly subcontractors, all of which need to interact with each other by frequent information exchanges. However, cross-border supply chains are found to be quite complex, resulting in risks that significantly affect the performance of PBPs. Supply chain risks (SCRs) are closely associated with the stakeholders involved and have high interdependency with each other. This paper adopts social network analysis (SNA) to develop the risk network of the supply chain of a PBP in Hong Kong to prioritize the stakeholder-associated SCR. The research findings show that poor planning of resources and schedule, poor control of working flows, and poor information sharing between stakeholders are the major challenges to the supply chains of PBPs. This is the first study to consider the dynamic risk interdependency and associated stakeholders in SCRs. By providing a greater understanding of the risks embedded across the supply chains of PBPs in Hong Kong, this study could assist practitioners dealing with such risks more effectively and efficiently.
    • Download: (555.0Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Stakeholder-Associated Supply Chain Risks and Their Interactions in a Prefabricated Building Project in Hong Kong

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4255248
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorLizi Luo; Geoffrey Qiping Shen; Gangyan Xu; Yunlin Liu; Yingjie Wang
    date accessioned2019-03-10T12:16:24Z
    date available2019-03-10T12:16:24Z
    date issued2019
    identifier other%28ASCE%29ME.1943-5479.0000675.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4255248
    description abstractPrefabricated building projects (PBPs) have contributed significantly to addressing Hong Kong’s serious housing shortage and accommodate almost half of the residents in this densely populated city. The supply chains of PBPs involve large numbers of stakeholders, including clients, designers, main contractors, transporters, and assembly subcontractors, all of which need to interact with each other by frequent information exchanges. However, cross-border supply chains are found to be quite complex, resulting in risks that significantly affect the performance of PBPs. Supply chain risks (SCRs) are closely associated with the stakeholders involved and have high interdependency with each other. This paper adopts social network analysis (SNA) to develop the risk network of the supply chain of a PBP in Hong Kong to prioritize the stakeholder-associated SCR. The research findings show that poor planning of resources and schedule, poor control of working flows, and poor information sharing between stakeholders are the major challenges to the supply chains of PBPs. This is the first study to consider the dynamic risk interdependency and associated stakeholders in SCRs. By providing a greater understanding of the risks embedded across the supply chains of PBPs in Hong Kong, this study could assist practitioners dealing with such risks more effectively and efficiently.
    publisherAmerican Society of Civil Engineers
    titleStakeholder-Associated Supply Chain Risks and Their Interactions in a Prefabricated Building Project in Hong Kong
    typeJournal Paper
    journal volume35
    journal issue2
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)ME.1943-5479.0000675
    page05018015
    treeJournal of Management in Engineering:;2019:;Volume ( 035 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian