YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Evaluation of Delay Causes for BOT Projects Based on Perceptions of Different Stakeholders in Turkey

    Source: Journal of Management in Engineering:;2019:;Volume ( 035 ):;issue: 001
    Author:
    Cenk Budayan
    DOI: 10.1061/(ASCE)ME.1943-5479.0000668
    Publisher: American Society of Civil Engineers
    Abstract: Because delays are common in construction projects, causes of delays are widely investigated in the construction-management literature. However, there is no consensus on the relative severity of various causes of delay because severity may change with respect to project characteristics, such as the type of project and/or procurement type. Public–private partnership (PPP) has been utilized extensively in recent years, and the number of public construction works worldwide that adopted the PPP has increased gradually. However, the delay causes specific to PPPs have not been investigated deeply. Moreover, the perceptions of different stakeholders on causes of delay in PPP projects have never been investigated, although the perception difference between stakeholders is considered an important issue in delay management. In this study, the perceptions of three key stakeholders—namely, consultants, the private sector, and the public sector—on delay causes in build–operate–transfer (BOT) projects performed in Turkey, which is one of the leading countries in terms of number of PPP projects and the total value of PPP projects, were investigated. The delay causes specific to BOT projects were evaluated by conducting a workshop to determine the causes of delay in the Turkish market. The identified delay causes were evaluated using the analytical hierarchical process (AHP) by 11 participants who represent consultants, the private sector, and the public sector. The correlations between the respondents were evaluated using Pearson’s correlation coefficient and Spearman’s rank correlation coefficient. This study showed that the most important delay causes are related to the uncertainties and changes. In particular, private sector participants emphasized the importance of certainty on political and governmental issues and minimization of changes in design to avoid delays in BOT projects. In contrast, the respondents from the public sector proposed that a detailed feasibility study and preliminary plan should be prepared and the transfer stage should be planned carefully. Finally, different perceptions were observed among the stakeholders at the stages where the collaboration of the stakeholders is limited.
    • Download: (253.8Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Evaluation of Delay Causes for BOT Projects Based on Perceptions of Different Stakeholders in Turkey

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4255241
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorCenk Budayan
    date accessioned2019-03-10T12:16:10Z
    date available2019-03-10T12:16:10Z
    date issued2019
    identifier other%28ASCE%29ME.1943-5479.0000668.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4255241
    description abstractBecause delays are common in construction projects, causes of delays are widely investigated in the construction-management literature. However, there is no consensus on the relative severity of various causes of delay because severity may change with respect to project characteristics, such as the type of project and/or procurement type. Public–private partnership (PPP) has been utilized extensively in recent years, and the number of public construction works worldwide that adopted the PPP has increased gradually. However, the delay causes specific to PPPs have not been investigated deeply. Moreover, the perceptions of different stakeholders on causes of delay in PPP projects have never been investigated, although the perception difference between stakeholders is considered an important issue in delay management. In this study, the perceptions of three key stakeholders—namely, consultants, the private sector, and the public sector—on delay causes in build–operate–transfer (BOT) projects performed in Turkey, which is one of the leading countries in terms of number of PPP projects and the total value of PPP projects, were investigated. The delay causes specific to BOT projects were evaluated by conducting a workshop to determine the causes of delay in the Turkish market. The identified delay causes were evaluated using the analytical hierarchical process (AHP) by 11 participants who represent consultants, the private sector, and the public sector. The correlations between the respondents were evaluated using Pearson’s correlation coefficient and Spearman’s rank correlation coefficient. This study showed that the most important delay causes are related to the uncertainties and changes. In particular, private sector participants emphasized the importance of certainty on political and governmental issues and minimization of changes in design to avoid delays in BOT projects. In contrast, the respondents from the public sector proposed that a detailed feasibility study and preliminary plan should be prepared and the transfer stage should be planned carefully. Finally, different perceptions were observed among the stakeholders at the stages where the collaboration of the stakeholders is limited.
    publisherAmerican Society of Civil Engineers
    titleEvaluation of Delay Causes for BOT Projects Based on Perceptions of Different Stakeholders in Turkey
    typeJournal Paper
    journal volume35
    journal issue1
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)ME.1943-5479.0000668
    page04018057
    treeJournal of Management in Engineering:;2019:;Volume ( 035 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian