YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Fuzzy Logic Model for Determining Minimum Overheads-Cum-Markup Rate

    Source: Journal of Construction Engineering and Management:;2019:;Volume ( 145 ):;issue: 004
    Author:
    Li-Chung Chao; Shinn-Jye Liaw
    DOI: 10.1061/(ASCE)CO.1943-7862.0001632
    Publisher: American Society of Civil Engineers
    Abstract: Contractors in bidding for a construction project often focus on the direct cost and determine a bid price by applying an overheads-cum-markup rate on top of the estimated direct cost. Such a simple method is prone to incorrectness if a rate is charged without a sound basis. As an improvement, a fuzzy logic model is proposed for determining the minimum rate for a project based on the bid position of a contractor. Using the estimates of chance of winning and loss risk as inputs, the model incorporates the bid position in a set of fuzzy rules that reflect the degree of need for work and risk attitude. A regression equation built from bid data for public sector projects connects the ratio of winning bid to owner’s budget with project attributes and is used in estimating the chances of winning for various rates. An illustrative example is provided, in which the rules representing the bid positions in nine scenarios were formulated and recent bids in Taiwan were collected for building the regression equation. The results of simulation of bidding for two bidding cases show that the model can differentiate the bid positions and suggest minimum overheads-cum-markup rates consistently. The model may prevent inadequate rates in bidding under intense price competition, thus advancing the field of bidding.
    • Download: (430.4Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Fuzzy Logic Model for Determining Minimum Overheads-Cum-Markup Rate

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4254697
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorLi-Chung Chao; Shinn-Jye Liaw
    date accessioned2019-03-10T12:01:58Z
    date available2019-03-10T12:01:58Z
    date issued2019
    identifier other%28ASCE%29CO.1943-7862.0001632.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4254697
    description abstractContractors in bidding for a construction project often focus on the direct cost and determine a bid price by applying an overheads-cum-markup rate on top of the estimated direct cost. Such a simple method is prone to incorrectness if a rate is charged without a sound basis. As an improvement, a fuzzy logic model is proposed for determining the minimum rate for a project based on the bid position of a contractor. Using the estimates of chance of winning and loss risk as inputs, the model incorporates the bid position in a set of fuzzy rules that reflect the degree of need for work and risk attitude. A regression equation built from bid data for public sector projects connects the ratio of winning bid to owner’s budget with project attributes and is used in estimating the chances of winning for various rates. An illustrative example is provided, in which the rules representing the bid positions in nine scenarios were formulated and recent bids in Taiwan were collected for building the regression equation. The results of simulation of bidding for two bidding cases show that the model can differentiate the bid positions and suggest minimum overheads-cum-markup rates consistently. The model may prevent inadequate rates in bidding under intense price competition, thus advancing the field of bidding.
    publisherAmerican Society of Civil Engineers
    titleFuzzy Logic Model for Determining Minimum Overheads-Cum-Markup Rate
    typeJournal Paper
    journal volume145
    journal issue4
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0001632
    page04019008
    treeJournal of Construction Engineering and Management:;2019:;Volume ( 145 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian