YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Impact of Activity Sequencing on Reducing Variability

    Source: Journal of Construction Engineering and Management:;2019:;Volume ( 145 ):;issue: 003
    Author:
    Søren M. Lindhard; Farook Hamzeh; Vicente A. Gonzalez; Søren Wandahl; Lene F. Ussing
    DOI: 10.1061/(ASCE)CO.1943-7862.0001618
    Publisher: American Society of Civil Engineers
    Abstract: Variation in production is a major cause of producing waste in onsite construction operations, resulting in a workflow that is full of delays and interruptions. To reduce the negative impact of waste in construction, production managers need to address the causes of the variation that results in such waste. This paper explains the way to reduce the effects of variation in construction by changing the task sequence arrangement. The study analyzed the effect of some different task sequence arrangements on the production gap, crew waiting time, and production delay by simulating a group of work tasks and changing the task sequence arrangement from linear to parallel. Accordingly, 100 work activities were simulated in 98 different sequence designs, using a stochastic discrete-event simulation model, during which the number of parallel activities was systematically increased. The main finding from the studied configuration is that arranging tasks in parallel increases waste, whereas it reduces project duration. Moreover, waste resulting from variation was found to be an additional cause of waste when accelerating the production. Finally, it was revealed that the impact of variation on the task sequence highly depends on how often the schedule is updated. This study helps production managers to better understand of how the task sequence arrangement affects production performance in onsite construction operations.
    • Download: (1.125Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Impact of Activity Sequencing on Reducing Variability

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4254681
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorSøren M. Lindhard; Farook Hamzeh; Vicente A. Gonzalez; Søren Wandahl; Lene F. Ussing
    date accessioned2019-03-10T12:01:37Z
    date available2019-03-10T12:01:37Z
    date issued2019
    identifier other%28ASCE%29CO.1943-7862.0001618.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4254681
    description abstractVariation in production is a major cause of producing waste in onsite construction operations, resulting in a workflow that is full of delays and interruptions. To reduce the negative impact of waste in construction, production managers need to address the causes of the variation that results in such waste. This paper explains the way to reduce the effects of variation in construction by changing the task sequence arrangement. The study analyzed the effect of some different task sequence arrangements on the production gap, crew waiting time, and production delay by simulating a group of work tasks and changing the task sequence arrangement from linear to parallel. Accordingly, 100 work activities were simulated in 98 different sequence designs, using a stochastic discrete-event simulation model, during which the number of parallel activities was systematically increased. The main finding from the studied configuration is that arranging tasks in parallel increases waste, whereas it reduces project duration. Moreover, waste resulting from variation was found to be an additional cause of waste when accelerating the production. Finally, it was revealed that the impact of variation on the task sequence highly depends on how often the schedule is updated. This study helps production managers to better understand of how the task sequence arrangement affects production performance in onsite construction operations.
    publisherAmerican Society of Civil Engineers
    titleImpact of Activity Sequencing on Reducing Variability
    typeJournal Paper
    journal volume145
    journal issue3
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0001618
    page04019001
    treeJournal of Construction Engineering and Management:;2019:;Volume ( 145 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian