YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Zero-One Formulation for a Partial Resource-Constrained Project Scheduling Problem with Generalized Precedence Relations

    Source: Journal of Construction Engineering and Management:;2019:;Volume ( 145 ):;issue: 003
    Author:
    Zhi-Xiong Su; Han-Ying Wei; Xin Zou; Jian-Xun Qi
    DOI: 10.1061/(ASCE)CO.1943-7862.0001613
    Publisher: American Society of Civil Engineers
    Abstract: The resource-constrained project scheduling problem (RCPSP) aims to arrange activities to meet resource restrictions. In real life, not all resource types are constrained, nor do all activities face resource restrictions. The RCPSP may emerge in parts of the project, which could be named a partial RCPSP. A fundamental principle for RCPSPs is to sequence parallel activities to sequential ones under resource restrictions. This paper considers a typical partial RCPSP with generalized precedence relations (GPRs) and transforms it into a sequence problem that specifically sequences N given parallel activities to H sequential activity pairs with minimal impact on the project duration. The characteristics of activity time parameters are used to quantize the impact of sequencing parallel activities on the project duration. Furthermore, a 0-1 formulation model is presented for the partial RCPSP with GPRs, which includes only the N given parallel activities instead of all activities. The performance of this formulation is evaluated, and detailed computational results are presented for the sequence problem that evaluate the efficiency and competitiveness of this procedure. The obtained results may also serve as theoretical tools for other partial RCPSP with GPRs and may further improve project scheduling.
    • Download: (925.1Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Zero-One Formulation for a Partial Resource-Constrained Project Scheduling Problem with Generalized Precedence Relations

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4254677
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorZhi-Xiong Su; Han-Ying Wei; Xin Zou; Jian-Xun Qi
    date accessioned2019-03-10T12:01:32Z
    date available2019-03-10T12:01:32Z
    date issued2019
    identifier other%28ASCE%29CO.1943-7862.0001613.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4254677
    description abstractThe resource-constrained project scheduling problem (RCPSP) aims to arrange activities to meet resource restrictions. In real life, not all resource types are constrained, nor do all activities face resource restrictions. The RCPSP may emerge in parts of the project, which could be named a partial RCPSP. A fundamental principle for RCPSPs is to sequence parallel activities to sequential ones under resource restrictions. This paper considers a typical partial RCPSP with generalized precedence relations (GPRs) and transforms it into a sequence problem that specifically sequences N given parallel activities to H sequential activity pairs with minimal impact on the project duration. The characteristics of activity time parameters are used to quantize the impact of sequencing parallel activities on the project duration. Furthermore, a 0-1 formulation model is presented for the partial RCPSP with GPRs, which includes only the N given parallel activities instead of all activities. The performance of this formulation is evaluated, and detailed computational results are presented for the sequence problem that evaluate the efficiency and competitiveness of this procedure. The obtained results may also serve as theoretical tools for other partial RCPSP with GPRs and may further improve project scheduling.
    publisherAmerican Society of Civil Engineers
    titleZero-One Formulation for a Partial Resource-Constrained Project Scheduling Problem with Generalized Precedence Relations
    typeJournal Paper
    journal volume145
    journal issue3
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0001613
    page04018142
    treeJournal of Construction Engineering and Management:;2019:;Volume ( 145 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian