YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Effect of BIM on Rework in Construction Projects in Singapore: Status Quo, Magnitude, Impact, and Strategies

    Source: Journal of Construction Engineering and Management:;2019:;Volume ( 145 ):;issue: 002
    Author:
    Bon-Gang Hwang; Xiaojing Zhao; Kay Wei Yang
    DOI: 10.1061/(ASCE)CO.1943-7862.0001600
    Publisher: American Society of Civil Engineers
    Abstract: Rework is a pervasive problem that adversely impacts the performance of construction projects and has become one of the most common concerns of the industry and academia. The rapid popularization of Building Information Modeling (BIM) is deemed useful for controlling rework and its resulting cost and time overruns. However, little empirical research has been done to show the impact of BIM implementation on rework in construction projects. As a result, by comparing two groups of projects (with and without BIM implementation), this paper first aims to assess and compare the rework status quo as well as the rework magnitude and impact by project type and by rework source. This study also proposes a set of practical strategies that can help prevent rework in projects with BIM implementation using a fuzzy set theory-based model. To achieve these objectives, an extensive literature review was conducted, followed by pre-interviews, a questionnaire survey, statistical analyses, and post-interviews. The results of the analyses and interviews show that the projects with BIM implementation tend to have experienced lower incidence, magnitude, and impact of rework relative to projects without BIM implementation. BIM implementation is also found to have a significant impact on reducing rework arising from owner change, design error/omission, design change, and vendor error/omission. The identified top three strategies to utilize BIM to reduce rework are “use of BIM throughout the design and construction phase,” “design reviews, verifications, and audit to reduce system errors,” and “rework tracking system to prevent future occurrences of rework.” To the best of the authors’ knowledge, this study makes the first attempt to measure the effects of BIM implementation on rework in construction projects using actual project data. The findings of this study enable practitioners to implement strategies to minimize rework with BIM implementation, improve projects’ cost and time performance, and improve the efficiency of project delivery.
    • Download: (403.2Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Effect of BIM on Rework in Construction Projects in Singapore: Status Quo, Magnitude, Impact, and Strategies

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4254664
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorBon-Gang Hwang; Xiaojing Zhao; Kay Wei Yang
    date accessioned2019-03-10T12:01:21Z
    date available2019-03-10T12:01:21Z
    date issued2019
    identifier other%28ASCE%29CO.1943-7862.0001600.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4254664
    description abstractRework is a pervasive problem that adversely impacts the performance of construction projects and has become one of the most common concerns of the industry and academia. The rapid popularization of Building Information Modeling (BIM) is deemed useful for controlling rework and its resulting cost and time overruns. However, little empirical research has been done to show the impact of BIM implementation on rework in construction projects. As a result, by comparing two groups of projects (with and without BIM implementation), this paper first aims to assess and compare the rework status quo as well as the rework magnitude and impact by project type and by rework source. This study also proposes a set of practical strategies that can help prevent rework in projects with BIM implementation using a fuzzy set theory-based model. To achieve these objectives, an extensive literature review was conducted, followed by pre-interviews, a questionnaire survey, statistical analyses, and post-interviews. The results of the analyses and interviews show that the projects with BIM implementation tend to have experienced lower incidence, magnitude, and impact of rework relative to projects without BIM implementation. BIM implementation is also found to have a significant impact on reducing rework arising from owner change, design error/omission, design change, and vendor error/omission. The identified top three strategies to utilize BIM to reduce rework are “use of BIM throughout the design and construction phase,” “design reviews, verifications, and audit to reduce system errors,” and “rework tracking system to prevent future occurrences of rework.” To the best of the authors’ knowledge, this study makes the first attempt to measure the effects of BIM implementation on rework in construction projects using actual project data. The findings of this study enable practitioners to implement strategies to minimize rework with BIM implementation, improve projects’ cost and time performance, and improve the efficiency of project delivery.
    publisherAmerican Society of Civil Engineers
    titleEffect of BIM on Rework in Construction Projects in Singapore: Status Quo, Magnitude, Impact, and Strategies
    typeJournal Paper
    journal volume145
    journal issue2
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0001600
    page04018125
    treeJournal of Construction Engineering and Management:;2019:;Volume ( 145 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian