YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Computing in Civil Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Computing in Civil Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Space-Time Repetitive Project Scheduling Considering Location and Congestion

    Source: Journal of Computing in Civil Engineering:;2018:;Volume ( 032 ):;issue: 003
    Author:
    Tao Sha;Wu Changzhi;Sheng Zhaohan;Wang Xiangyu
    DOI: 10.1061/(ASCE)CP.1943-5487.0000745
    Publisher: American Society of Civil Engineers
    Abstract: Repetitive projects account for a large proportion of construction projects. Different from standard project scheduling problems, scheduling such projects requires considering both location and congestion, which is referred to as a space-time project scheduling problem. The literature on this kind of project scheduling is rather limited. In this paper, the authors study this problem and formulate it as a multiobjective mixed-integer programming problem which minimizes resource reallocation and congestion. A nondominated sorting genetic algorithm II (NSGAII) modified by integrating an electromagnetism-like mechanism, NSGAII-EM, is developed to solve this problem. Refurbishing a multistory hotel is used as an example to illustrate and validate the proposed method. Compared with the problem not considering location or congestion, the proposed model can offer better use of resources and can improve productivity through a better and safer working environment on the construction site. Furthermore, NSGAII-EM is validated by comparing it with NSGAII, strength Pareto evolutionary algorithm II (SPEAII), Pareto envelope-based selection algorithm II (PESAII), multiobjective evolutionary algorithm based on decomposition (MOEA/D), multiobjective particle swarm optimization (MOPSO), SPEAII-electromagnetism-like mechanism (SPEAII-EM), PESAII-electromagnetism-like mechanism (PESAII-EM), and MOEA/D-electromagnetism-like mechanism (MOEA/D-EM).
    • Download: (2.589Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Space-Time Repetitive Project Scheduling Considering Location and Congestion

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4250367
    Collections
    • Journal of Computing in Civil Engineering

    Show full item record

    contributor authorTao Sha;Wu Changzhi;Sheng Zhaohan;Wang Xiangyu
    date accessioned2019-02-26T07:56:02Z
    date available2019-02-26T07:56:02Z
    date issued2018
    identifier other%28ASCE%29CP.1943-5487.0000745.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4250367
    description abstractRepetitive projects account for a large proportion of construction projects. Different from standard project scheduling problems, scheduling such projects requires considering both location and congestion, which is referred to as a space-time project scheduling problem. The literature on this kind of project scheduling is rather limited. In this paper, the authors study this problem and formulate it as a multiobjective mixed-integer programming problem which minimizes resource reallocation and congestion. A nondominated sorting genetic algorithm II (NSGAII) modified by integrating an electromagnetism-like mechanism, NSGAII-EM, is developed to solve this problem. Refurbishing a multistory hotel is used as an example to illustrate and validate the proposed method. Compared with the problem not considering location or congestion, the proposed model can offer better use of resources and can improve productivity through a better and safer working environment on the construction site. Furthermore, NSGAII-EM is validated by comparing it with NSGAII, strength Pareto evolutionary algorithm II (SPEAII), Pareto envelope-based selection algorithm II (PESAII), multiobjective evolutionary algorithm based on decomposition (MOEA/D), multiobjective particle swarm optimization (MOPSO), SPEAII-electromagnetism-like mechanism (SPEAII-EM), PESAII-electromagnetism-like mechanism (PESAII-EM), and MOEA/D-electromagnetism-like mechanism (MOEA/D-EM).
    publisherAmerican Society of Civil Engineers
    titleSpace-Time Repetitive Project Scheduling Considering Location and Congestion
    typeJournal Paper
    journal volume32
    journal issue3
    journal titleJournal of Computing in Civil Engineering
    identifier doi10.1061/(ASCE)CP.1943-5487.0000745
    page4018017
    treeJournal of Computing in Civil Engineering:;2018:;Volume ( 032 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian