YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Developing More Competitive Proposals: Relationship between Contractor Qualifications-Based Proposal Content and Owner Evaluation Scores

    Source: Journal of Construction Engineering and Management:;2018:;Volume ( 144 ):;issue: 005
    Author:
    Lines Brian C.;Ravi Kumar Gagan Gowda
    DOI: 10.1061/(ASCE)CO.1943-7862.0001479
    Publisher: American Society of Civil Engineers
    Abstract: Construction contractors have historically been procured through price-driven methods. Yet the increased use of alternate project delivery methods, along with owner-perceived concerns over construction performance, has led many owners to introduce qualifications-based selection criteria into their procurement systems. As a result, construction contractors are tasked with preparation of qualifications-based proposal submittals ever more frequently. Contractors must therefore develop strategies to consistently differentiate their qualifications from those of their their competitors, which can lead to more favorable owner evaluation scores and ultimately improve their hit rate. This paper performed a content analysis of 71 contractor proposals containing both successful and unsuccessful bids. Regression results indicate that contractor project management proposals receive more favorable owner evaluation scores when contractor-controlled, design-related, and concealed conditions content are emphasized. Regression results show that contractor scope alternate proposals are encouraged to provide a comprehensive review of potential scope options to enhance the project and ensure the associated cost and schedule impacts are clearly defined.
    • Download: (190.8Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Developing More Competitive Proposals: Relationship between Contractor Qualifications-Based Proposal Content and Owner Evaluation Scores

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4250340
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorLines Brian C.;Ravi Kumar Gagan Gowda
    date accessioned2019-02-26T07:55:46Z
    date available2019-02-26T07:55:46Z
    date issued2018
    identifier other%28ASCE%29CO.1943-7862.0001479.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4250340
    description abstractConstruction contractors have historically been procured through price-driven methods. Yet the increased use of alternate project delivery methods, along with owner-perceived concerns over construction performance, has led many owners to introduce qualifications-based selection criteria into their procurement systems. As a result, construction contractors are tasked with preparation of qualifications-based proposal submittals ever more frequently. Contractors must therefore develop strategies to consistently differentiate their qualifications from those of their their competitors, which can lead to more favorable owner evaluation scores and ultimately improve their hit rate. This paper performed a content analysis of 71 contractor proposals containing both successful and unsuccessful bids. Regression results indicate that contractor project management proposals receive more favorable owner evaluation scores when contractor-controlled, design-related, and concealed conditions content are emphasized. Regression results show that contractor scope alternate proposals are encouraged to provide a comprehensive review of potential scope options to enhance the project and ensure the associated cost and schedule impacts are clearly defined.
    publisherAmerican Society of Civil Engineers
    titleDeveloping More Competitive Proposals: Relationship between Contractor Qualifications-Based Proposal Content and Owner Evaluation Scores
    typeJournal Paper
    journal volume144
    journal issue5
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0001479
    page4018030
    treeJournal of Construction Engineering and Management:;2018:;Volume ( 144 ):;issue: 005
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian