YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Dynamic Programming Approach toward Optimization of Workforce Planning Decisions

    Source: Journal of Construction Engineering and Management:;2018:;Volume ( 144 ):;issue: 002
    Author:
    Ahmadian Fard Fini Alireza;Akbarnezhad Ali;Rashidi Taha H.;Waller S. Travis
    DOI: 10.1061/(ASCE)CO.1943-7862.0001434
    Publisher: American Society of Civil Engineers
    Abstract: Workforce planning plays a pivotal role in smooth execution of construction projects. The growing challenges faced by the construction industry related to skill shortage, aging problem, and workforce attraction, retention, and buy-in have added to technical complexities of workforce planning. Nevertheless, the available workforce planning techniques are either qualitative or lack a strategic perspective that accounts for the above challenges in hiring workforce, leading to suboptimal decisions with regards to hiring and unplanned firing. This paper proposes a novel framework for optimization of hiring and firing decisions by accounting simultaneously for organizational human resource (HR) strategies, labor rights, and technical and managerial constraints of a construction project. The framework starts by setting the model parameters and the decision-making criteria using the information made available by building information modeling (BIM), project performance database, and contractual and legislative documents. It then identifies the optimal mode and duration of the employment for the workers with different skills, skill levels, and multiskilling capabilities using a dynamic programming algorithm. The application and advantages of the proposed framework are demonstrated using a case study.
    • Download: (1000.Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Dynamic Programming Approach toward Optimization of Workforce Planning Decisions

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4250298
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorAhmadian Fard Fini Alireza;Akbarnezhad Ali;Rashidi Taha H.;Waller S. Travis
    date accessioned2019-02-26T07:55:21Z
    date available2019-02-26T07:55:21Z
    date issued2018
    identifier other%28ASCE%29CO.1943-7862.0001434.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4250298
    description abstractWorkforce planning plays a pivotal role in smooth execution of construction projects. The growing challenges faced by the construction industry related to skill shortage, aging problem, and workforce attraction, retention, and buy-in have added to technical complexities of workforce planning. Nevertheless, the available workforce planning techniques are either qualitative or lack a strategic perspective that accounts for the above challenges in hiring workforce, leading to suboptimal decisions with regards to hiring and unplanned firing. This paper proposes a novel framework for optimization of hiring and firing decisions by accounting simultaneously for organizational human resource (HR) strategies, labor rights, and technical and managerial constraints of a construction project. The framework starts by setting the model parameters and the decision-making criteria using the information made available by building information modeling (BIM), project performance database, and contractual and legislative documents. It then identifies the optimal mode and duration of the employment for the workers with different skills, skill levels, and multiskilling capabilities using a dynamic programming algorithm. The application and advantages of the proposed framework are demonstrated using a case study.
    publisherAmerican Society of Civil Engineers
    titleDynamic Programming Approach toward Optimization of Workforce Planning Decisions
    typeJournal Paper
    journal volume144
    journal issue2
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0001434
    page4017113
    treeJournal of Construction Engineering and Management:;2018:;Volume ( 144 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian