YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Performance of Supporting Structures of a Single-Floor Three-Span Metro Station during Column-Drift Tunneling in Dry Sandy Ground

    Source: Journal of Performance of Constructed Facilities:;2018:;Volume ( 032 ):;issue: 003
    Author:
    Wang Shuying;Liu Pengfei;Qu Tongming;Fu Jinyang;Zhou Jinqiang
    DOI: 10.1061/(ASCE)CF.1943-5509.0001166
    Publisher: American Society of Civil Engineers
    Abstract: Although the column-drift method is commonly used for constructing a shallow underground metro station, there are few comprehensive field monitoring studies to investigate the mechanical behavior during complicated construction procedures. This study investigates the stress and deformation characteristics of a single-floor three-span metro structure built by the column-drift method in dry sandy ground based on the field case of the Great Wall Qiao Station in Shijiazhuang Metro Line 1. The excavation started at the two pilot tunnels to erect the two columns, which then served as support structures for the middle drift and then the two side drifts, which were excavated last. By comparing the results obtained from field monitoring and numerical analysis, it was found that the crown settlement and convergence of the primary and temporary supports mainly occurred during the excavation of the lower parts of the top caverns in both the pilot tunnels and side drifts. The crown settlement of the middle drift was small due to the support of the early columns and longitudinal beams in the pilot tunnel. After the primary and temporary supports were closed, the deformation of the structure did not develop, suggesting that the temporary structure should be closed as soon as possible. When the middle and side drifts were constructed, the temporary supports were dismantled, resulting in an obvious increase in the stress of the remaining primary supports. Thus, the demolition length of the temporary structure per cycle should be strictly controlled. The surrounding load was partially transferred to the secondary lining in the side drifts after its final placement, which resulted in a decrease in the stress of the remaining primary supports. Once the middle drift was excavated, the top of the monitored column moved toward the station center line. After the transversal temporary supports between the left and right longitudinal top beams were fixed with prepressure, the top of the columns turned back to the opposite direction and their movement increased after the crown supports of the middle drift finished. In the meantime, the stress difference between the two longitudinal beams became obvious. The tilting of the column roofs decreased after the two side drifts were simultaneously constructed. It was suggested that the temporary transverse supports and the symmetrical construction of the side drifts were effective measures in controlling the tilting of columns.
    • Download: (2.318Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Performance of Supporting Structures of a Single-Floor Three-Span Metro Station during Column-Drift Tunneling in Dry Sandy Ground

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4250148
    Collections
    • Journal of Performance of Constructed Facilities

    Show full item record

    contributor authorWang Shuying;Liu Pengfei;Qu Tongming;Fu Jinyang;Zhou Jinqiang
    date accessioned2019-02-26T07:53:58Z
    date available2019-02-26T07:53:58Z
    date issued2018
    identifier other%28ASCE%29CF.1943-5509.0001166.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4250148
    description abstractAlthough the column-drift method is commonly used for constructing a shallow underground metro station, there are few comprehensive field monitoring studies to investigate the mechanical behavior during complicated construction procedures. This study investigates the stress and deformation characteristics of a single-floor three-span metro structure built by the column-drift method in dry sandy ground based on the field case of the Great Wall Qiao Station in Shijiazhuang Metro Line 1. The excavation started at the two pilot tunnels to erect the two columns, which then served as support structures for the middle drift and then the two side drifts, which were excavated last. By comparing the results obtained from field monitoring and numerical analysis, it was found that the crown settlement and convergence of the primary and temporary supports mainly occurred during the excavation of the lower parts of the top caverns in both the pilot tunnels and side drifts. The crown settlement of the middle drift was small due to the support of the early columns and longitudinal beams in the pilot tunnel. After the primary and temporary supports were closed, the deformation of the structure did not develop, suggesting that the temporary structure should be closed as soon as possible. When the middle and side drifts were constructed, the temporary supports were dismantled, resulting in an obvious increase in the stress of the remaining primary supports. Thus, the demolition length of the temporary structure per cycle should be strictly controlled. The surrounding load was partially transferred to the secondary lining in the side drifts after its final placement, which resulted in a decrease in the stress of the remaining primary supports. Once the middle drift was excavated, the top of the monitored column moved toward the station center line. After the transversal temporary supports between the left and right longitudinal top beams were fixed with prepressure, the top of the columns turned back to the opposite direction and their movement increased after the crown supports of the middle drift finished. In the meantime, the stress difference between the two longitudinal beams became obvious. The tilting of the column roofs decreased after the two side drifts were simultaneously constructed. It was suggested that the temporary transverse supports and the symmetrical construction of the side drifts were effective measures in controlling the tilting of columns.
    publisherAmerican Society of Civil Engineers
    titlePerformance of Supporting Structures of a Single-Floor Three-Span Metro Station during Column-Drift Tunneling in Dry Sandy Ground
    typeJournal Paper
    journal volume32
    journal issue3
    journal titleJournal of Performance of Constructed Facilities
    identifier doi10.1061/(ASCE)CF.1943-5509.0001166
    page4018015
    treeJournal of Performance of Constructed Facilities:;2018:;Volume ( 032 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian