YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Financial Conflict Resolution for Public-Private Partnership Projects Using a Three-Phase Game Framework

    Source: Journal of Construction Engineering and Management:;2018:;Volume ( 144 ):;issue: 003
    Author:
    Jang Woosik;Yu Giwon;Jung Wooyong;Kim Doyun;Han Seung Heon
    DOI: 10.1061/(ASCE)CO.1943-7862.0001442
    Publisher: American Society of Civil Engineers
    Abstract: Many countries use financial aids to expedite public-private partnership (PPP) projects, depending on their financial status and/or demand for additional infrastructure. Minimum revenue guarantees (MRGs) are one financial aid option that costs the Korean government US$2.7 billion in liabilities annually. To reduce these considerable expenditures, this study proposes resolving financial conflicts using a three-phase game framework with a bargaining phase, a ratification phase, and a decision-making phase. The first two phases are adopted from traditional two-level game theory, and the last phase is added to support sequential negotiations and multiple buyers. To confirm the usability of proposed framework, the authors conduct illustrative case applications with two representative real-life PPP cases. Case 1 shows that qualitative bargaining power can be accurately quantified, and Case 2 demonstrates that empirically calculated values can be used in negotiation practice. The framework proposed in this study reduces the range of negotiation, the time required to negotiate, and the damage caused by conflicts. Additionally, the frame is expected to support strategic negotiations and well-structured decisions in financial conflicts between key stakeholders.
    • Download: (497.9Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Financial Conflict Resolution for Public-Private Partnership Projects Using a Three-Phase Game Framework

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4250046
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorJang Woosik;Yu Giwon;Jung Wooyong;Kim Doyun;Han Seung Heon
    date accessioned2019-02-26T07:53:01Z
    date available2019-02-26T07:53:01Z
    date issued2018
    identifier other%28ASCE%29CO.1943-7862.0001442.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4250046
    description abstractMany countries use financial aids to expedite public-private partnership (PPP) projects, depending on their financial status and/or demand for additional infrastructure. Minimum revenue guarantees (MRGs) are one financial aid option that costs the Korean government US$2.7 billion in liabilities annually. To reduce these considerable expenditures, this study proposes resolving financial conflicts using a three-phase game framework with a bargaining phase, a ratification phase, and a decision-making phase. The first two phases are adopted from traditional two-level game theory, and the last phase is added to support sequential negotiations and multiple buyers. To confirm the usability of proposed framework, the authors conduct illustrative case applications with two representative real-life PPP cases. Case 1 shows that qualitative bargaining power can be accurately quantified, and Case 2 demonstrates that empirically calculated values can be used in negotiation practice. The framework proposed in this study reduces the range of negotiation, the time required to negotiate, and the damage caused by conflicts. Additionally, the frame is expected to support strategic negotiations and well-structured decisions in financial conflicts between key stakeholders.
    publisherAmerican Society of Civil Engineers
    titleFinancial Conflict Resolution for Public-Private Partnership Projects Using a Three-Phase Game Framework
    typeJournal Paper
    journal volume144
    journal issue3
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0001442
    page5017022
    treeJournal of Construction Engineering and Management:;2018:;Volume ( 144 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian