| contributor author | Ham Namhyuk;Moon Sungkon;Kim Ju-Hyung;Kim Jae-Jun | |
| date accessioned | 2019-02-26T07:52:57Z | |
| date available | 2019-02-26T07:52:57Z | |
| date issued | 2018 | |
| identifier other | %28ASCE%29CO.1943-7862.0001498.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl1/handle/yetl/4250038 | |
| description abstract | Design errors are one of the major risk factors causing rework and delay. Therefore, accurate cost analysis of potential economic losses attributable to design errors is crucial from a practical point of view. This paper proposes a basis for establishing building information modeling (BIM) investment strategies by quantifying the various costs associated with design errors for error prevention. The design errors were classified into three basic types: simple design (Type 1); rework-related (Type 2) that may lead to demolition and rework; and delay-related (Type 3) likely to prolong the construction period. To evaluate the effects of BIM application quantitatively, the performance potential of BIM-assisted identification of individual design errors was examined. A comparison of the influences of classified design errors on the project revealed that the total cost of the design errors leading to schedule delay was 194.69% higher than that of the simple design errors and the direct design error costs due to errors leading to demolition and rework. | |
| publisher | American Society of Civil Engineers | |
| title | Economic Analysis of Design Errors in BIM-Based High-Rise Construction Projects: Case Study of Haeundae L Project | |
| type | Journal Paper | |
| journal volume | 144 | |
| journal issue | 6 | |
| journal title | Journal of Construction Engineering and Management | |
| identifier doi | 10.1061/(ASCE)CO.1943-7862.0001498 | |
| page | 5018006 | |
| tree | Journal of Construction Engineering and Management:;2018:;Volume ( 144 ):;issue: 006 | |
| contenttype | Fulltext | |