YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Hybrid Bored Prestressed Concrete Cased Piles: Equipment and Construction Procedures

    Source: Journal of Construction Engineering and Management:;2018:;Volume ( 144 ):;issue: 012
    Author:
    Chen Hang;Hu Hesong;Tang Mengxiong;Yang Xiaosong;Zhu Jianxin
    DOI: 10.1061/(ASCE)CO.1943-7862.0001578
    Publisher: American Society of Civil Engineers
    Abstract: To widen the applications of large-diameter prestressed high-strength concrete (PHC) piles to stiff strata, this paper introduces a novel hybrid piling technique, including the equipment and construction procedures. The spiral drilling operation provides space for simultaneously lowering the piles, and the detected real-time parameters characterizing the construction status can be also automatically transferred to additional exciting force or constraints acting on the piles by a sophisticated feedback loop. The application of the proposed technique is verified with two large-diameter test piles installed into stiff weathered granite. It is experimentally demonstrated that, taking advantage of the unique grouted gap between the piles and the bored hole, the pile–strata adhesive strength and therefore the shaft resistance of the pile are significantly enhanced. Comparison of the tested piles shows that the trade-off relation between the grout quality and the modulus reduction of the strata plays an important role in controlling the bearing performance of the piles because the shaft resistance does not always increase with the modulus of the surrounding strata if the strength of the grouted interface is relatively small. The findings can provide fundamental guidance for further optimization of the proposed technique from the aspects of both design and construction.
    • Download: (1.035Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Hybrid Bored Prestressed Concrete Cased Piles: Equipment and Construction Procedures

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4250016
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorChen Hang;Hu Hesong;Tang Mengxiong;Yang Xiaosong;Zhu Jianxin
    date accessioned2019-02-26T07:52:41Z
    date available2019-02-26T07:52:41Z
    date issued2018
    identifier other%28ASCE%29CO.1943-7862.0001578.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4250016
    description abstractTo widen the applications of large-diameter prestressed high-strength concrete (PHC) piles to stiff strata, this paper introduces a novel hybrid piling technique, including the equipment and construction procedures. The spiral drilling operation provides space for simultaneously lowering the piles, and the detected real-time parameters characterizing the construction status can be also automatically transferred to additional exciting force or constraints acting on the piles by a sophisticated feedback loop. The application of the proposed technique is verified with two large-diameter test piles installed into stiff weathered granite. It is experimentally demonstrated that, taking advantage of the unique grouted gap between the piles and the bored hole, the pile–strata adhesive strength and therefore the shaft resistance of the pile are significantly enhanced. Comparison of the tested piles shows that the trade-off relation between the grout quality and the modulus reduction of the strata plays an important role in controlling the bearing performance of the piles because the shaft resistance does not always increase with the modulus of the surrounding strata if the strength of the grouted interface is relatively small. The findings can provide fundamental guidance for further optimization of the proposed technique from the aspects of both design and construction.
    publisherAmerican Society of Civil Engineers
    titleHybrid Bored Prestressed Concrete Cased Piles: Equipment and Construction Procedures
    typeJournal Paper
    journal volume144
    journal issue12
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0001578
    page6018006
    treeJournal of Construction Engineering and Management:;2018:;Volume ( 144 ):;issue: 012
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian