YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Safety Risk Identification and Assessment for Beijing Olympic Venues Construction

    Source: Journal of Management in Engineering:;2008:;Volume ( 024 ):;issue: 001
    Author:
    Yu Sun
    ,
    Dongping Fang
    ,
    Shouqing Wang
    ,
    Mengdong Dai
    ,
    Xiaoquan Lv
    DOI: 10.1061/(ASCE)0742-597X(2008)24:1(40)
    Publisher: American Society of Civil Engineers
    Abstract: New technologies, new materials, and innovative designs have been extensively adopted in Beijing Olympic venues construction. The extreme requirements for time deadline and competition function expose the venues construction to high risks. These risks would potentially bring negative impacts on the site safety performance. Meanwhile, there is a lack of systematic management for safety risks in China’s construction industry, especially for large projects such as the Beijing Olympic venues construction. This paper identifies and assesses safety risk factors inherent in Beijing Olympic venues construction with the involvement of 27 experienced and highly respected experts from government agencies, the construction industry, and academe through brainstorming, workshop discussions, and questionnaire surveys. The finding reveals that more than half of the critical safety risk factors are from contractors and subcontractors such as: lack of emergency response plan and measures; workers’ unsafe operation, and contractors ignoring safety under schedule pressure. Based on these critical safety risks, a risk register is composed and a model is developed in application of the analytic hierarchy process to assess the status of risks on site safety. The model has been attempted in two Olympic venue projects under construction and the validity has been approved. The risk checklist, register, and assessment model developed in the paper were integrated into the risk management system that has been used for Beijing Olympic venues construction.
    • Download: (206.9Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Safety Risk Identification and Assessment for Beijing Olympic Venues Construction

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/42500
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorYu Sun
    contributor authorDongping Fang
    contributor authorShouqing Wang
    contributor authorMengdong Dai
    contributor authorXiaoquan Lv
    date accessioned2017-05-08T21:12:01Z
    date available2017-05-08T21:12:01Z
    date copyrightJanuary 2008
    date issued2008
    identifier other%28asce%290742-597x%282008%2924%3A1%2840%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/42500
    description abstractNew technologies, new materials, and innovative designs have been extensively adopted in Beijing Olympic venues construction. The extreme requirements for time deadline and competition function expose the venues construction to high risks. These risks would potentially bring negative impacts on the site safety performance. Meanwhile, there is a lack of systematic management for safety risks in China’s construction industry, especially for large projects such as the Beijing Olympic venues construction. This paper identifies and assesses safety risk factors inherent in Beijing Olympic venues construction with the involvement of 27 experienced and highly respected experts from government agencies, the construction industry, and academe through brainstorming, workshop discussions, and questionnaire surveys. The finding reveals that more than half of the critical safety risk factors are from contractors and subcontractors such as: lack of emergency response plan and measures; workers’ unsafe operation, and contractors ignoring safety under schedule pressure. Based on these critical safety risks, a risk register is composed and a model is developed in application of the analytic hierarchy process to assess the status of risks on site safety. The model has been attempted in two Olympic venue projects under construction and the validity has been approved. The risk checklist, register, and assessment model developed in the paper were integrated into the risk management system that has been used for Beijing Olympic venues construction.
    publisherAmerican Society of Civil Engineers
    titleSafety Risk Identification and Assessment for Beijing Olympic Venues Construction
    typeJournal Paper
    journal volume24
    journal issue1
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)0742-597X(2008)24:1(40)
    treeJournal of Management in Engineering:;2008:;Volume ( 024 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian