YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Collaborative Role of Sociotechnical Components in BIM-Based Construction Networks in Two Hospitals

    Source: Journal of Management in Engineering:;2018:;Volume ( 034 ):;issue: 004
    Author:
    Merschbrock Christoph;Hosseini M. Reza;Martek Igor;Arashpour Mehrdad;Mignone Gerard
    DOI: 10.1061/(ASCE)ME.1943-5479.0000605
    Publisher: American Society of Civil Engineers
    Abstract: Building information modeling (BIM)–based construction networks (BbCNs) are teams of specialist organizations working together to execute BIM-related tasks on BIM-enabled projects. Despite the recognized advantages of BbCNs, collaboration among BbCN members remains a serious weakness of BIM-enabled projects. This study compared two highly technologically advanced BIM-enabled hospital projects: one in Norway and one in Australia. Both projects had in common similar technical components, but each settled on a divergent collaborative solution. An extended version of the Leavitt sociotechnical model was used as the theoretical point of departure to inform and interpret the evolution of BbCNs in these two cases. The analysis of the empirical data revealed two emerging collaborative solutions for rectifying misalignment between sociotechnical and technical components of BbCNs during BIM-generated design documentation. The findings confirm that complex projects experience variable numbers of information-sharing participants who depend on and interact with both tangible and intangible knowledge, to varying degrees, over time. Because of these varying interactions, the communication networks on which the project depended must shift to seek realignment among the Leavitt model elements, including actors, tasks, technologies, and systems, within BbCNs. To achieve and maintain effective collaboration within networks, the proactive management intervention of dynamic and evolving requirements and the incorporation of the components of perceptual, attitudinal, and structural influences (PASIs) into BbCNs are of key importance in correcting any misalignments among actors, tasks, and systems.
    • Download: (827.7Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Collaborative Role of Sociotechnical Components in BIM-Based Construction Networks in Two Hospitals

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4249605
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorMerschbrock Christoph;Hosseini M. Reza;Martek Igor;Arashpour Mehrdad;Mignone Gerard
    date accessioned2019-02-26T07:49:06Z
    date available2019-02-26T07:49:06Z
    date issued2018
    identifier other%28ASCE%29ME.1943-5479.0000605.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4249605
    description abstractBuilding information modeling (BIM)–based construction networks (BbCNs) are teams of specialist organizations working together to execute BIM-related tasks on BIM-enabled projects. Despite the recognized advantages of BbCNs, collaboration among BbCN members remains a serious weakness of BIM-enabled projects. This study compared two highly technologically advanced BIM-enabled hospital projects: one in Norway and one in Australia. Both projects had in common similar technical components, but each settled on a divergent collaborative solution. An extended version of the Leavitt sociotechnical model was used as the theoretical point of departure to inform and interpret the evolution of BbCNs in these two cases. The analysis of the empirical data revealed two emerging collaborative solutions for rectifying misalignment between sociotechnical and technical components of BbCNs during BIM-generated design documentation. The findings confirm that complex projects experience variable numbers of information-sharing participants who depend on and interact with both tangible and intangible knowledge, to varying degrees, over time. Because of these varying interactions, the communication networks on which the project depended must shift to seek realignment among the Leavitt model elements, including actors, tasks, technologies, and systems, within BbCNs. To achieve and maintain effective collaboration within networks, the proactive management intervention of dynamic and evolving requirements and the incorporation of the components of perceptual, attitudinal, and structural influences (PASIs) into BbCNs are of key importance in correcting any misalignments among actors, tasks, and systems.
    publisherAmerican Society of Civil Engineers
    titleCollaborative Role of Sociotechnical Components in BIM-Based Construction Networks in Two Hospitals
    typeJournal Paper
    journal volume34
    journal issue4
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)ME.1943-5479.0000605
    page5018006
    treeJournal of Management in Engineering:;2018:;Volume ( 034 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian