YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Loosely Coupled Systems of Innovation: Aligning BIM Adoption with Implementation in Dutch Construction

    Source: Journal of Management in Engineering:;2018:;Volume ( 034 ):;issue: 006
    Author:
    Papadonikolaki Eleni
    DOI: 10.1061/(ASCE)ME.1943-5479.0000644
    Publisher: American Society of Civil Engineers
    Abstract: As an innovation, building information modeling (BIM) plays a key role in the digital transformation of the construction industry. Whereas innovations affect and are affected by organizational behavior, they are better observed at a project level because they are shaped by a network of various project actors. This study connected intra- (micro) and interorganizational (meso) levels of BIM implementation. To explore the relation between BIM adoption drivers and BIM implementation in projects, three case studies were analyzed qualitatively through the theoretical lens of loosely coupled systems. The findings showed that although individual firms had strong external or internal BIM motivations and visions to adopt BIM innovation, the project networks rarely coordinated to support BIM implementation. Consequently, the project networks that were motivated by internal BIM adoption drivers (e.g., quality assurance) implemented BIM collaboratively and flexibly. Contrariwise, networks of firms that adopted BIM simply to comply with external demand (e.g., macroscopic market pressures or client demand) were rigid and competitive during BIM implementation and hindered knowledge transfer and innovation change management. Drawing upon the empirical data, other factors affecting BIM implementation and in need of further interorganizational alignment were corporate compatibility, interfirm knowledge mobility, and interfirm power dynamics. The implication is the need for further alignment of visions about BIM innovation decision making across firms to support effective BIM implementation in projects.
    • Download: (327.1Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Loosely Coupled Systems of Innovation: Aligning BIM Adoption with Implementation in Dutch Construction

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4249595
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorPapadonikolaki Eleni
    date accessioned2019-02-26T07:49:00Z
    date available2019-02-26T07:49:00Z
    date issued2018
    identifier other%28ASCE%29ME.1943-5479.0000644.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4249595
    description abstractAs an innovation, building information modeling (BIM) plays a key role in the digital transformation of the construction industry. Whereas innovations affect and are affected by organizational behavior, they are better observed at a project level because they are shaped by a network of various project actors. This study connected intra- (micro) and interorganizational (meso) levels of BIM implementation. To explore the relation between BIM adoption drivers and BIM implementation in projects, three case studies were analyzed qualitatively through the theoretical lens of loosely coupled systems. The findings showed that although individual firms had strong external or internal BIM motivations and visions to adopt BIM innovation, the project networks rarely coordinated to support BIM implementation. Consequently, the project networks that were motivated by internal BIM adoption drivers (e.g., quality assurance) implemented BIM collaboratively and flexibly. Contrariwise, networks of firms that adopted BIM simply to comply with external demand (e.g., macroscopic market pressures or client demand) were rigid and competitive during BIM implementation and hindered knowledge transfer and innovation change management. Drawing upon the empirical data, other factors affecting BIM implementation and in need of further interorganizational alignment were corporate compatibility, interfirm knowledge mobility, and interfirm power dynamics. The implication is the need for further alignment of visions about BIM innovation decision making across firms to support effective BIM implementation in projects.
    publisherAmerican Society of Civil Engineers
    titleLoosely Coupled Systems of Innovation: Aligning BIM Adoption with Implementation in Dutch Construction
    typeJournal Paper
    journal volume34
    journal issue6
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)ME.1943-5479.0000644
    page5018009
    treeJournal of Management in Engineering:;2018:;Volume ( 034 ):;issue: 006
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian