Multi-Timescale Joint Optimal Dispatch Model Considering Environmental Flow Requirements for a Dewatered River Channel: Case Study of Jinping Cascade Hydropower StationsSource: Journal of Water Resources Planning and Management:;2018:;Volume ( 144 ):;issue: 010Author:Guo Xin-yu;Ma Chao;Tang Zhi-bo
DOI: 10.1061/(ASCE)WR.1943-5452.0000981Publisher: American Society of Civil Engineers
Abstract: In this study, the authors developed a multi-timescale optimal dispatch model to balance both the environmental flow requirement of the downstream dewatered river channel and the power output of the cascade hydropower stations. The operation characteristics of turbine units, reservoir regulation capacity, inseparable hydraulic connections, and the mass balance equation of the cascade reservoirs and water head loss characteristics of the tunnels have been considered to constrain the model. The daily average flow solution set of the monthly timescale model was converted to a daily flow process solution set of the daily timescale model to decouple the two-hierarchy model. The application of the model with two hierarchies shows that the model can reduce the dimension of the decision variables and derive optimal decisions more quickly to simultaneously meet the two objectives. Considering the environmental flow demand of the dewatered river channel, this study puts forward an operation strategy for Jinping cascade hydropower stations. The research results can provide decision support for other cascade reservoirs that have a dewatered river channel.
|
Show full item record
contributor author | Guo Xin-yu;Ma Chao;Tang Zhi-bo | |
date accessioned | 2019-02-26T07:47:16Z | |
date available | 2019-02-26T07:47:16Z | |
date issued | 2018 | |
identifier other | %28ASCE%29WR.1943-5452.0000981.pdf | |
identifier uri | http://yetl.yabesh.ir/yetl1/handle/yetl/4249380 | |
description abstract | In this study, the authors developed a multi-timescale optimal dispatch model to balance both the environmental flow requirement of the downstream dewatered river channel and the power output of the cascade hydropower stations. The operation characteristics of turbine units, reservoir regulation capacity, inseparable hydraulic connections, and the mass balance equation of the cascade reservoirs and water head loss characteristics of the tunnels have been considered to constrain the model. The daily average flow solution set of the monthly timescale model was converted to a daily flow process solution set of the daily timescale model to decouple the two-hierarchy model. The application of the model with two hierarchies shows that the model can reduce the dimension of the decision variables and derive optimal decisions more quickly to simultaneously meet the two objectives. Considering the environmental flow demand of the dewatered river channel, this study puts forward an operation strategy for Jinping cascade hydropower stations. The research results can provide decision support for other cascade reservoirs that have a dewatered river channel. | |
publisher | American Society of Civil Engineers | |
title | Multi-Timescale Joint Optimal Dispatch Model Considering Environmental Flow Requirements for a Dewatered River Channel: Case Study of Jinping Cascade Hydropower Stations | |
type | Journal Paper | |
journal volume | 144 | |
journal issue | 10 | |
journal title | Journal of Water Resources Planning and Management | |
identifier doi | 10.1061/(ASCE)WR.1943-5452.0000981 | |
page | 5018014 | |
tree | Journal of Water Resources Planning and Management:;2018:;Volume ( 144 ):;issue: 010 | |
contenttype | Fulltext |