YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Managing Construction Projects through Dynamic Modeling: Reviewing the Existing Body of Knowledge and Deriving Future Research Directions

    Source: Journal of Management in Engineering:;2018:;Volume ( 034 ):;issue: 006
    Author:
    Abotaleb Ibrahim S.;El-adaway Islam H.
    DOI: 10.1061/(ASCE)ME.1943-5479.0000633
    Publisher: American Society of Civil Engineers
    Abstract: To improve decision making in construction projects, dynamic models have been developed to grasp the complex project dynamics that traditional scheduling and decision-making techniques miss. However, each of the existing dynamic models focuses only on limited parameters impacting the project management cycle and thus are unable to capture the full picture. Accordingly, this paper reviews the existing literature related to utilizing dynamic modeling for construction management applications with the objective of grasping in a holistic manner the direct and indirect impacts of different project parameters. To this effect, the authors: (1) conducted a meta-analysis of previous studies of dynamic modeling in construction management; (2) identified and defined interrelated dynamic parameters that impact project performance; and (3) used social network analysis (SNA) to quantitatively pinpoint the strengths and gaps in the literature and provide a roadmap toward the areas that should be further addressed. For example, one of the important findings is the need to further investigate the dynamics of out-of-sequence work and its impact on project performance, since such dynamics were found to be rarely examined. Another important finding is the absence of models incorporating simultaneously all dynamic parameters. The paper concludes by presenting guidelines—including a conceptual framework—to proactively derive future research directions toward more effective and efficient management of today’s complex construction projects. Ultimately, the comprehensive analytic approach suggested by this research could result in better decision-making processes, reduced cost and schedule overruns, and timely and less costly resolution of claims and disputes.
    • Download: (2.132Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Managing Construction Projects through Dynamic Modeling: Reviewing the Existing Body of Knowledge and Deriving Future Research Directions

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4249195
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorAbotaleb Ibrahim S.;El-adaway Islam H.
    date accessioned2019-02-26T07:45:53Z
    date available2019-02-26T07:45:53Z
    date issued2018
    identifier other%28ASCE%29ME.1943-5479.0000633.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4249195
    description abstractTo improve decision making in construction projects, dynamic models have been developed to grasp the complex project dynamics that traditional scheduling and decision-making techniques miss. However, each of the existing dynamic models focuses only on limited parameters impacting the project management cycle and thus are unable to capture the full picture. Accordingly, this paper reviews the existing literature related to utilizing dynamic modeling for construction management applications with the objective of grasping in a holistic manner the direct and indirect impacts of different project parameters. To this effect, the authors: (1) conducted a meta-analysis of previous studies of dynamic modeling in construction management; (2) identified and defined interrelated dynamic parameters that impact project performance; and (3) used social network analysis (SNA) to quantitatively pinpoint the strengths and gaps in the literature and provide a roadmap toward the areas that should be further addressed. For example, one of the important findings is the need to further investigate the dynamics of out-of-sequence work and its impact on project performance, since such dynamics were found to be rarely examined. Another important finding is the absence of models incorporating simultaneously all dynamic parameters. The paper concludes by presenting guidelines—including a conceptual framework—to proactively derive future research directions toward more effective and efficient management of today’s complex construction projects. Ultimately, the comprehensive analytic approach suggested by this research could result in better decision-making processes, reduced cost and schedule overruns, and timely and less costly resolution of claims and disputes.
    publisherAmerican Society of Civil Engineers
    titleManaging Construction Projects through Dynamic Modeling: Reviewing the Existing Body of Knowledge and Deriving Future Research Directions
    typeJournal Paper
    journal volume34
    journal issue6
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)ME.1943-5479.0000633
    page4018033
    treeJournal of Management in Engineering:;2018:;Volume ( 034 ):;issue: 006
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian