YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Infrastructure Systems
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Infrastructure Systems
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Residual Value Risks of Highway Pavements in Public–Private Partnerships

    Source: Journal of Infrastructure Systems:;2018:;Volume ( 024 ):;issue: 003
    Author:
    Yuan Xian-Xun;Li Yuanshun
    DOI: 10.1061/(ASCE)IS.1943-555X.0000438
    Publisher: American Society of Civil Engineers
    Abstract: Residual value risk of an infrastructure asset under public–private partnerships (P3s) refers to the risk that on expiry or termination of the P3 contract, the asset does not have the value that the sponsoring public authority originally expected. A concern arises that significant residual value risk might present in long-term P3 projects. To address the concern, this paper presents a semiempirical method to quantify the residual value risk in P3 pavement assets relative to the public-sector comparators (PSCs). Based on a long-term pavement performance database maintained by a provincial ministry of transportation in Canada, the study shows that P3 pavement assets significantly outperform the PSCs in terms of service life, the probability and duration of deferred maintenance, and the residual life after the concession period. It was found that the average residual life of a P3 asset reaches 13.5 years, more than double the average residual life of 6.3 years of a PSC. Based on a modified depreciation method at zero discount rate, these residual lives were translated into mean residual values of 45. and 24.7% of capital expenditure for the P3 and PSC assets, respectively. The simulation study at different discount rates found that while the mean residual value risk is significantly greater than zero, suggesting obvious outperformance of P3s over traditional delivery methods, the probability that the residual value of a P3 asset is less than that of a PSC does not change with the discount rate and is stabilized at 2%. The outperformance of P3 assets over PSC assets was mainly attributed to the disciplined asset management and strict handback requirements under P3s. The study concludes that the P3 model, when the contract is strictly implemented, can effectively manage and mitigate the residual value risk in pavement assets.
    • Download: (738.8Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Residual Value Risks of Highway Pavements in Public–Private Partnerships

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4249151
    Collections
    • Journal of Infrastructure Systems

    Show full item record

    contributor authorYuan Xian-Xun;Li Yuanshun
    date accessioned2019-02-26T07:45:34Z
    date available2019-02-26T07:45:34Z
    date issued2018
    identifier other%28ASCE%29IS.1943-555X.0000438.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4249151
    description abstractResidual value risk of an infrastructure asset under public–private partnerships (P3s) refers to the risk that on expiry or termination of the P3 contract, the asset does not have the value that the sponsoring public authority originally expected. A concern arises that significant residual value risk might present in long-term P3 projects. To address the concern, this paper presents a semiempirical method to quantify the residual value risk in P3 pavement assets relative to the public-sector comparators (PSCs). Based on a long-term pavement performance database maintained by a provincial ministry of transportation in Canada, the study shows that P3 pavement assets significantly outperform the PSCs in terms of service life, the probability and duration of deferred maintenance, and the residual life after the concession period. It was found that the average residual life of a P3 asset reaches 13.5 years, more than double the average residual life of 6.3 years of a PSC. Based on a modified depreciation method at zero discount rate, these residual lives were translated into mean residual values of 45. and 24.7% of capital expenditure for the P3 and PSC assets, respectively. The simulation study at different discount rates found that while the mean residual value risk is significantly greater than zero, suggesting obvious outperformance of P3s over traditional delivery methods, the probability that the residual value of a P3 asset is less than that of a PSC does not change with the discount rate and is stabilized at 2%. The outperformance of P3 assets over PSC assets was mainly attributed to the disciplined asset management and strict handback requirements under P3s. The study concludes that the P3 model, when the contract is strictly implemented, can effectively manage and mitigate the residual value risk in pavement assets.
    publisherAmerican Society of Civil Engineers
    titleResidual Value Risks of Highway Pavements in Public–Private Partnerships
    typeJournal Paper
    journal volume24
    journal issue3
    journal titleJournal of Infrastructure Systems
    identifier doi10.1061/(ASCE)IS.1943-555X.0000438
    page4018020
    treeJournal of Infrastructure Systems:;2018:;Volume ( 024 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian