YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Installation of Integral Prefabricated Bridge Abutment and Pier with Flexible Water Stop Curtain

    Source: Journal of Construction Engineering and Management:;2018:;Volume ( 144 ):;issue: 009
    Author:
    Chen Rufa;Tan Yu;Zhang Bingliu;Shen Weiguo;Liu Gangliang;Wang Zhongwen
    DOI: 10.1061/(ASCE)CO.1943-7862.0001544
    Publisher: American Society of Civil Engineers
    Abstract: Construction of the abutment, pier, and pier cap of long cross-sea bridges are challenging in complex marine environments. In the Hong Kong–Zhuhai–Macao Bridge (HZMB) project, an installation process characterized by concrete integral prefabricated abutment and pier (IPAP) with a flexible water stop curtain was invented. Studies showed that the underwater connection of IPAP and foundation piles can be achieved by adopting the steel cover box (SCB) scheme and separate flexible tray water stop technology. Compression bimodal GINA water stops are valid to seal the gap between SCB and IPAP. The horizontal water stops between trays and IPAP underside are achieved by jacking and compressing GINA water stops, whereas the vertical water stops between trays and steel piles casing (SPC) within 2 m deep underwater are achieved by a rubber capsule with .4 MPa pressure. After achieving the water stop between reserved holes and SPC, rapidly hardening concrete is cast into reserved holes. This reliable, efficient, and ecologically friendly innovative construction process, especially the water stop method, ensures that HZMB was constructed more safely and efficiently the China White Dolphin habitat.
    • Download: (2.563Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Installation of Integral Prefabricated Bridge Abutment and Pier with Flexible Water Stop Curtain

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4248592
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorChen Rufa;Tan Yu;Zhang Bingliu;Shen Weiguo;Liu Gangliang;Wang Zhongwen
    date accessioned2019-02-26T07:39:59Z
    date available2019-02-26T07:39:59Z
    date issued2018
    identifier other%28ASCE%29CO.1943-7862.0001544.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4248592
    description abstractConstruction of the abutment, pier, and pier cap of long cross-sea bridges are challenging in complex marine environments. In the Hong Kong–Zhuhai–Macao Bridge (HZMB) project, an installation process characterized by concrete integral prefabricated abutment and pier (IPAP) with a flexible water stop curtain was invented. Studies showed that the underwater connection of IPAP and foundation piles can be achieved by adopting the steel cover box (SCB) scheme and separate flexible tray water stop technology. Compression bimodal GINA water stops are valid to seal the gap between SCB and IPAP. The horizontal water stops between trays and IPAP underside are achieved by jacking and compressing GINA water stops, whereas the vertical water stops between trays and steel piles casing (SPC) within 2 m deep underwater are achieved by a rubber capsule with .4 MPa pressure. After achieving the water stop between reserved holes and SPC, rapidly hardening concrete is cast into reserved holes. This reliable, efficient, and ecologically friendly innovative construction process, especially the water stop method, ensures that HZMB was constructed more safely and efficiently the China White Dolphin habitat.
    publisherAmerican Society of Civil Engineers
    titleInstallation of Integral Prefabricated Bridge Abutment and Pier with Flexible Water Stop Curtain
    typeJournal Paper
    journal volume144
    journal issue9
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0001544
    page4018087
    treeJournal of Construction Engineering and Management:;2018:;Volume ( 144 ):;issue: 009
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian