YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Hybrid Prequalification-Based, Innovative Contracting Model Using AHP

    Source: Journal of Management in Engineering:;2007:;Volume ( 023 ):;issue: 002
    Author:
    Osama Abudayyeh
    ,
    Saad J. Zidan
    ,
    Sherif Yehia
    ,
    Dennis Randolph
    DOI: 10.1061/(ASCE)0742-597X(2007)23:2(88)
    Publisher: American Society of Civil Engineers
    Abstract: Design-build, cost-plus-time, and warranty are three innovative contracting methods used by the Federal Highway Administration (FHwA). Because of the challenges inherent in the nature of these approaches, contractors need to be capable and experienced to successfully deliver projects. It is then necessary to prequalify contractors to reduce the inherent risk of a project. Therefore, the objective of the research project described in this paper is to provide a methodology that will help public owners prequalify and select contractors within the context of the three delivery methods mentioned above. As a result, a hybrid prequalification and selection model to screen contractors who want to submit bids on public projects using any of the three innovative contracting methods above was developed. The analytical hierarchy process (AHP) was used to make prequalification decisions when multiple criteria are used. In addition, three case studies were developed to evaluate the application of AHP to the prequalification criteria in the three innovative contracting methods. AHP was utilized as an effective prequalification decision-making tool that eliminates subjectivity and produces decisions built on consistent judgments.
    • Download: (144.9Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Hybrid Prequalification-Based, Innovative Contracting Model Using AHP

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/42480
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorOsama Abudayyeh
    contributor authorSaad J. Zidan
    contributor authorSherif Yehia
    contributor authorDennis Randolph
    date accessioned2017-05-08T21:11:59Z
    date available2017-05-08T21:11:59Z
    date copyrightApril 2007
    date issued2007
    identifier other%28asce%290742-597x%282007%2923%3A2%2888%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/42480
    description abstractDesign-build, cost-plus-time, and warranty are three innovative contracting methods used by the Federal Highway Administration (FHwA). Because of the challenges inherent in the nature of these approaches, contractors need to be capable and experienced to successfully deliver projects. It is then necessary to prequalify contractors to reduce the inherent risk of a project. Therefore, the objective of the research project described in this paper is to provide a methodology that will help public owners prequalify and select contractors within the context of the three delivery methods mentioned above. As a result, a hybrid prequalification and selection model to screen contractors who want to submit bids on public projects using any of the three innovative contracting methods above was developed. The analytical hierarchy process (AHP) was used to make prequalification decisions when multiple criteria are used. In addition, three case studies were developed to evaluate the application of AHP to the prequalification criteria in the three innovative contracting methods. AHP was utilized as an effective prequalification decision-making tool that eliminates subjectivity and produces decisions built on consistent judgments.
    publisherAmerican Society of Civil Engineers
    titleHybrid Prequalification-Based, Innovative Contracting Model Using AHP
    typeJournal Paper
    journal volume23
    journal issue2
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)0742-597X(2007)23:2(88)
    treeJournal of Management in Engineering:;2007:;Volume ( 023 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian