YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Empirical Identification and Evaluation of Risk in Highway Project Delivery Methods

    Source: Journal of Management in Engineering:;2018:;Volume ( 034 ):;issue: 003
    Author:
    Bypaneni Sai P. K.;Tran Dai Q.
    DOI: 10.1061/(ASCE)ME.1943-5479.0000602
    Publisher: American Society of Civil Engineers
    Abstract: The highway industry currently uses three fundamental delivery methods, design-bid-build (D-B-B), design-build (D-B), and construction manager/general contractor (CM/GC), to deliver transportation projects. Selecting an appropriate project delivery method is a complex decision and often fraught with risk and uncertainty. This article presents the results of a two-tiered approach to evaluating the impacts of risks and uncertainties on project delivery selection in highway projects. Tier 1 involved identifying and verifying 31 risk factors related to project delivery based on the responses of experts with an average of 25 years of relevant experience. Tier 2 involved an empirical evaluation of project delivery risks through the analysis of 274 completed highway projects (122 D-B-B, 118 D-B, and 34 CM/GC) collected from 26 transportation agencies. The risk score of each risk factor was determined. The Cronbach’s alpha test and correlation analysis were conducted to verify the internal consistency, interdependency, and reliability of delivery risk factors. The results showed that the following eight risk factors substantially impact the project delivery decision: (1) delays in completing in railroad agreements, (2) project complexity, (3) uncertainty in geotechnical investigation, (4) delays in a right-of-way (ROW) process, (5) unexpected utility encounter, (6) work-zone traffic control, (7) challenges to obtaining environmental documentation, and (8) delays in delivery schedules. These eight risk factors are discussed in detail using the content analysis of Tier 1 and the relevant literature. Highway agencies and other practitioners can use these risk factors to make more effective and defensible decisions on which delivery method is the most suitable for their transportation projects.
    • Download: (260.4Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Empirical Identification and Evaluation of Risk in Highway Project Delivery Methods

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4247483
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorBypaneni Sai P. K.;Tran Dai Q.
    date accessioned2019-02-26T07:30:41Z
    date available2019-02-26T07:30:41Z
    date issued2018
    identifier other%28ASCE%29ME.1943-5479.0000602.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4247483
    description abstractThe highway industry currently uses three fundamental delivery methods, design-bid-build (D-B-B), design-build (D-B), and construction manager/general contractor (CM/GC), to deliver transportation projects. Selecting an appropriate project delivery method is a complex decision and often fraught with risk and uncertainty. This article presents the results of a two-tiered approach to evaluating the impacts of risks and uncertainties on project delivery selection in highway projects. Tier 1 involved identifying and verifying 31 risk factors related to project delivery based on the responses of experts with an average of 25 years of relevant experience. Tier 2 involved an empirical evaluation of project delivery risks through the analysis of 274 completed highway projects (122 D-B-B, 118 D-B, and 34 CM/GC) collected from 26 transportation agencies. The risk score of each risk factor was determined. The Cronbach’s alpha test and correlation analysis were conducted to verify the internal consistency, interdependency, and reliability of delivery risk factors. The results showed that the following eight risk factors substantially impact the project delivery decision: (1) delays in completing in railroad agreements, (2) project complexity, (3) uncertainty in geotechnical investigation, (4) delays in a right-of-way (ROW) process, (5) unexpected utility encounter, (6) work-zone traffic control, (7) challenges to obtaining environmental documentation, and (8) delays in delivery schedules. These eight risk factors are discussed in detail using the content analysis of Tier 1 and the relevant literature. Highway agencies and other practitioners can use these risk factors to make more effective and defensible decisions on which delivery method is the most suitable for their transportation projects.
    publisherAmerican Society of Civil Engineers
    titleEmpirical Identification and Evaluation of Risk in Highway Project Delivery Methods
    typeJournal Paper
    journal volume34
    journal issue3
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)ME.1943-5479.0000602
    page4018007
    treeJournal of Management in Engineering:;2018:;Volume ( 034 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian