YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Multidimensional Highway Construction Cost Indexes Using Dynamic Item Basket

    Source: Journal of Construction Engineering and Management:;2017:;Volume ( 143 ):;issue: 008
    Author:
    K. Joseph Shrestha
    ,
    H. David Jeong
    ,
    Douglas D. Gransberg
    DOI: 10.1061/(ASCE)CO.1943-7862.0001307
    Publisher: American Society of Civil Engineers
    Abstract: A highway construction cost index (HCCI) is an indicator of the purchasing power of a highway agency. Thus, it must reflect the actual construction market conditions. However, current methods used by most state departments of transportation are not robust enough to meet this primary goal due to (1) a significantly insufficient sample size of bid items used in HCCI calculation; and (2) inability to address the need to track highway construction market conditions in specific submarket segments such as, but not limited to, various project types, sizes, and locations. This study proposes an advanced methodology to overcome these apparent limitations using two new concepts: (1) dynamic item basket; and (2) multidimensional HCCIs. The dynamic item basket process identifies and utilizes an optimum amount of bid-item data to calculate HCCIs in order to minimize the potential error due to a small sample size, which leads to a better reflection of the current market conditions. Multidimensional HCCIs dissect the state highway construction market into distinctively smaller sectors of interest and thus, allow state Departments of Transportation to understand the market conditions with much higher granularity. A framework is developed to integrate these two concepts and a standalone prototype system, named the Dyna-Mu-HCCI System, is developed to automate the data-processing part of the framework. The historical bid data of the Montana Department of Transportation are used to evaluate the performance of the Dyna-Mu-HCCI System and measure the effects of the dynamic item basket (DIB) and multidimensional HCCIs. The results show an eightfold increase in terms of the number of bid items used in calculating HCCIs and at least a 20% increase in terms of the total cost of bid items used. In addition, the multidimensional HCCIs reveal different cost-change patterns from different highway sectors. For example, the bridge construction market historically shows a very different trend compared with the overall highway construction market. The new methodology is expected to aid state Departments of Transportation in making more-reliable decisions in preparing business plans and budgets with more accurate and detailed information about the construction market conditions. Further, the prototype Dyna-Mu-HCCI System is expected to significantly facilitate the HCCI calculation process and rapidly implement this new system.
    • Download: (921.8Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Multidimensional Highway Construction Cost Indexes Using Dynamic Item Basket

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4245666
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorK. Joseph Shrestha
    contributor authorH. David Jeong
    contributor authorDouglas D. Gransberg
    date accessioned2017-12-30T13:06:21Z
    date available2017-12-30T13:06:21Z
    date issued2017
    identifier other%28ASCE%29CO.1943-7862.0001307.pdf
    identifier urihttp://138.201.223.254:8080/yetl1/handle/yetl/4245666
    description abstractA highway construction cost index (HCCI) is an indicator of the purchasing power of a highway agency. Thus, it must reflect the actual construction market conditions. However, current methods used by most state departments of transportation are not robust enough to meet this primary goal due to (1) a significantly insufficient sample size of bid items used in HCCI calculation; and (2) inability to address the need to track highway construction market conditions in specific submarket segments such as, but not limited to, various project types, sizes, and locations. This study proposes an advanced methodology to overcome these apparent limitations using two new concepts: (1) dynamic item basket; and (2) multidimensional HCCIs. The dynamic item basket process identifies and utilizes an optimum amount of bid-item data to calculate HCCIs in order to minimize the potential error due to a small sample size, which leads to a better reflection of the current market conditions. Multidimensional HCCIs dissect the state highway construction market into distinctively smaller sectors of interest and thus, allow state Departments of Transportation to understand the market conditions with much higher granularity. A framework is developed to integrate these two concepts and a standalone prototype system, named the Dyna-Mu-HCCI System, is developed to automate the data-processing part of the framework. The historical bid data of the Montana Department of Transportation are used to evaluate the performance of the Dyna-Mu-HCCI System and measure the effects of the dynamic item basket (DIB) and multidimensional HCCIs. The results show an eightfold increase in terms of the number of bid items used in calculating HCCIs and at least a 20% increase in terms of the total cost of bid items used. In addition, the multidimensional HCCIs reveal different cost-change patterns from different highway sectors. For example, the bridge construction market historically shows a very different trend compared with the overall highway construction market. The new methodology is expected to aid state Departments of Transportation in making more-reliable decisions in preparing business plans and budgets with more accurate and detailed information about the construction market conditions. Further, the prototype Dyna-Mu-HCCI System is expected to significantly facilitate the HCCI calculation process and rapidly implement this new system.
    publisherAmerican Society of Civil Engineers
    titleMultidimensional Highway Construction Cost Indexes Using Dynamic Item Basket
    typeJournal Paper
    journal volume143
    journal issue8
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0001307
    page04017036
    treeJournal of Construction Engineering and Management:;2017:;Volume ( 143 ):;issue: 008
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian