YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    A Computational Method for Estimating Travel Frequencies in Site Layout Planning

    Source: Journal of Construction Engineering and Management:;2016:;Volume ( 142 ):;issue: 005
    Author:
    Ahmed W. A. Hammad
    ,
    Ali Akbarnezhad
    ,
    David Rey
    ,
    S. Travis Waller
    DOI: 10.1061/(ASCE)CO.1943-7862.0001086
    Publisher: American Society of Civil Engineers
    Abstract: Optimizing the layout of facilities on a construction site to minimize the material handling costs has been widely investigated in the literature. An integral part of the objective function utilized in the previously proposed optimization models is the frequency parameter, which generally provides a rough estimate of the frequency of travel between each pair of facilities at a specific stage of the project. The majority of travel frequencies deduced in prior studies have been estimated merely based on past experience and may not be an actual representation of movements within the project studied. There is currently a lack of a systematic approach for estimating travel frequencies, required in site layout planning, based on the information available at early stages of the project. Obtaining a reasonable estimate of the travel frequency matrix requires a realistic evaluation of the material transportation quantities at each construction stage. This necessitates the utilization of information on the progress of different activities and their corresponding material needs during the various stages. This paper presents a framework for obtaining travel frequencies at different construction project phases by taking advantage of the information made available by building information models and project schedules. The estimated frequencies are later embedded as parameters in an optimization model to improve site layout planning. The results of a case study are presented to highlight the capabilities of the proposed framework.
    • Download: (7.706Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      A Computational Method for Estimating Travel Frequencies in Site Layout Planning

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4245609
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorAhmed W. A. Hammad
    contributor authorAli Akbarnezhad
    contributor authorDavid Rey
    contributor authorS. Travis Waller
    date accessioned2017-12-30T13:06:07Z
    date available2017-12-30T13:06:07Z
    date issued2016
    identifier other%28ASCE%29CO.1943-7862.0001086.pdf
    identifier urihttp://138.201.223.254:8080/yetl1/handle/yetl/4245609
    description abstractOptimizing the layout of facilities on a construction site to minimize the material handling costs has been widely investigated in the literature. An integral part of the objective function utilized in the previously proposed optimization models is the frequency parameter, which generally provides a rough estimate of the frequency of travel between each pair of facilities at a specific stage of the project. The majority of travel frequencies deduced in prior studies have been estimated merely based on past experience and may not be an actual representation of movements within the project studied. There is currently a lack of a systematic approach for estimating travel frequencies, required in site layout planning, based on the information available at early stages of the project. Obtaining a reasonable estimate of the travel frequency matrix requires a realistic evaluation of the material transportation quantities at each construction stage. This necessitates the utilization of information on the progress of different activities and their corresponding material needs during the various stages. This paper presents a framework for obtaining travel frequencies at different construction project phases by taking advantage of the information made available by building information models and project schedules. The estimated frequencies are later embedded as parameters in an optimization model to improve site layout planning. The results of a case study are presented to highlight the capabilities of the proposed framework.
    publisherAmerican Society of Civil Engineers
    titleA Computational Method for Estimating Travel Frequencies in Site Layout Planning
    typeJournal Paper
    journal volume142
    journal issue5
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0001086
    page04015102
    treeJournal of Construction Engineering and Management:;2016:;Volume ( 142 ):;issue: 005
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian