YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Application of Case-Based Reasoning for Estimating Preliminary Duration of Building Projects

    Source: Journal of Construction Engineering and Management:;2016:;Volume ( 142 ):;issue: 002
    Author:
    RunZhi Jin
    ,
    Sangwon Han
    ,
    ChangTaek Hyun
    ,
    Yongwoon Cha
    DOI: 10.1061/(ASCE)CO.1943-7862.0001072
    Publisher: American Society of Civil Engineers
    Abstract: The applicability and effectiveness of case-based reasoning (CBR) have been demonstrated in various construction management areas, including bidding, international market selection, safety hazard identification, construction litigation, and preliminary cost estimation. Despite its strong potential as a decision-supporting tool in construction, only a few studies have applied CBR for estimating the preliminary duration that is necessary for the overall success of a construction project. Based on this recognition, this paper develops a CBR model capable of accurately estimating the construction duration in the preliminary stage. The applicability and effectiveness of the developed model are tested through application to 83 multihousing projects. The test results confirm the strong potential of CBR to provide an accurate estimate of construction duration with limited information available in the preliminary stage. This paper is significant in that it provides practitioners with a reliable decision-supporting tool for accurately estimating construction duration, and thus, ultimately increases the possibility of successful project execution.
    • Download: (260.2Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Application of Case-Based Reasoning for Estimating Preliminary Duration of Building Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4245597
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorRunZhi Jin
    contributor authorSangwon Han
    contributor authorChangTaek Hyun
    contributor authorYongwoon Cha
    date accessioned2017-12-30T13:06:05Z
    date available2017-12-30T13:06:05Z
    date issued2016
    identifier other%28ASCE%29CO.1943-7862.0001072.pdf
    identifier urihttp://138.201.223.254:8080/yetl1/handle/yetl/4245597
    description abstractThe applicability and effectiveness of case-based reasoning (CBR) have been demonstrated in various construction management areas, including bidding, international market selection, safety hazard identification, construction litigation, and preliminary cost estimation. Despite its strong potential as a decision-supporting tool in construction, only a few studies have applied CBR for estimating the preliminary duration that is necessary for the overall success of a construction project. Based on this recognition, this paper develops a CBR model capable of accurately estimating the construction duration in the preliminary stage. The applicability and effectiveness of the developed model are tested through application to 83 multihousing projects. The test results confirm the strong potential of CBR to provide an accurate estimate of construction duration with limited information available in the preliminary stage. This paper is significant in that it provides practitioners with a reliable decision-supporting tool for accurately estimating construction duration, and thus, ultimately increases the possibility of successful project execution.
    publisherAmerican Society of Civil Engineers
    titleApplication of Case-Based Reasoning for Estimating Preliminary Duration of Building Projects
    typeJournal Paper
    journal volume142
    journal issue2
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0001072
    page04015082
    treeJournal of Construction Engineering and Management:;2016:;Volume ( 142 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian