YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Computing in Civil Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Computing in Civil Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Zero-One Programming Approach to Determine Optimum Resource Supply under Time-Dependent Resource Constraints

    Source: Journal of Computing in Civil Engineering:;2016:;Volume ( 030 ):;issue: 002
    Author:
    Ming-Fung Francis Siu
    ,
    Ming Lu
    ,
    Simaan AbouRizk
    DOI: 10.1061/(ASCE)CP.1943-5487.0000498
    Publisher: American Society of Civil Engineers
    Abstract: Skilled labor is critical to any construction project. The determination of optimum resource supply quantities over different project time periods compounds the resource-constrained project scheduling problem, which has yet to be formally formulated and analytically solved. Previous related research endeavors focused on the allocation of finite quantities of resources in order to arrive at the shortest total duration for a project. The proposed mathematical model is based on the modeling strategy underlying the zero-one programming approach, aiming to generate the optimum resource-constrained schedule under time-dependent resource constraints. Furthermore, a two-stage solution framework is devised to align with critical decision-making processes in current practices of project scheduling and workface planning. The resulting optimum schedule shortens total project duration while streamlining resource supply for each specified time period. An industrial turnaround project serves as the test bed to (1) demonstrate the effectiveness and computational efficiency of the proposed resource scheduling approach; and (2) identify the optimum time-dependent resource availability limits in practical application settings.
    • Download: (465.5Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Zero-One Programming Approach to Determine Optimum Resource Supply under Time-Dependent Resource Constraints

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4245466
    Collections
    • Journal of Computing in Civil Engineering

    Show full item record

    contributor authorMing-Fung Francis Siu
    contributor authorMing Lu
    contributor authorSimaan AbouRizk
    date accessioned2017-12-30T13:05:11Z
    date available2017-12-30T13:05:11Z
    date issued2016
    identifier other%28ASCE%29CP.1943-5487.0000498.pdf
    identifier urihttp://138.201.223.254:8080/yetl1/handle/yetl/4245466
    description abstractSkilled labor is critical to any construction project. The determination of optimum resource supply quantities over different project time periods compounds the resource-constrained project scheduling problem, which has yet to be formally formulated and analytically solved. Previous related research endeavors focused on the allocation of finite quantities of resources in order to arrive at the shortest total duration for a project. The proposed mathematical model is based on the modeling strategy underlying the zero-one programming approach, aiming to generate the optimum resource-constrained schedule under time-dependent resource constraints. Furthermore, a two-stage solution framework is devised to align with critical decision-making processes in current practices of project scheduling and workface planning. The resulting optimum schedule shortens total project duration while streamlining resource supply for each specified time period. An industrial turnaround project serves as the test bed to (1) demonstrate the effectiveness and computational efficiency of the proposed resource scheduling approach; and (2) identify the optimum time-dependent resource availability limits in practical application settings.
    publisherAmerican Society of Civil Engineers
    titleZero-One Programming Approach to Determine Optimum Resource Supply under Time-Dependent Resource Constraints
    typeJournal Paper
    journal volume30
    journal issue2
    journal titleJournal of Computing in Civil Engineering
    identifier doi10.1061/(ASCE)CP.1943-5487.0000498
    page04015028
    treeJournal of Computing in Civil Engineering:;2016:;Volume ( 030 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian