YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Daily Generation Scheduling of Cascade Hydro Plants Considering Peak Shaving Constraints

    Source: Journal of Water Resources Planning and Management:;2016:;Volume ( 142 ):;issue: 004
    Author:
    Mengfei Xie
    ,
    Jianzhong Zhou
    ,
    Chunlong Li
    ,
    Peng Lu
    DOI: 10.1061/(ASCE)WR.1943-5452.0000622
    Publisher: American Society of Civil Engineers
    Abstract: This paper considers the operation of hydro plants, tackles the problem of daily hydro-generation scheduling (DHGS), and obtains the optimal hourly operation of cascade hydropower reservoirs. To meet the practical operational demands of power grid, an improved benefit-maximization model in which the peak shaving demands are taken as constraints is proposed for DHGS, and the joint peak load regulation (JPLR) method is applied to the proposed model. The model can enhance the power-generation efficiency and reduce the water spillage significantly under the condition of peak load regulation. Meanwhile, a hybrid method that combines discrete differential dynamic programming with progressive optimality algorithm is proposed to solve the JPLR problem. The complicated constraints can be handled by the proposed algorithm effectively. Moreover, the hydro-unit-commitment problem is solved by a rapid searching algorithm based on equal incremental principle and empirical methods. With this unit-commitment strategy, the computation speed can be accelerated and approximate optimal solutions can be obtained in a reasonable time frame. The proposed model and methods are applied to the DHGS of cascade hydro plants in Zagunao River in China and achieve good performance.
    • Download: (2.375Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Daily Generation Scheduling of Cascade Hydro Plants Considering Peak Shaving Constraints

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4244856
    Collections
    • Journal of Water Resources Planning and Management

    Show full item record

    contributor authorMengfei Xie
    contributor authorJianzhong Zhou
    contributor authorChunlong Li
    contributor authorPeng Lu
    date accessioned2017-12-30T13:02:20Z
    date available2017-12-30T13:02:20Z
    date issued2016
    identifier other%28ASCE%29WR.1943-5452.0000622.pdf
    identifier urihttp://138.201.223.254:8080/yetl1/handle/yetl/4244856
    description abstractThis paper considers the operation of hydro plants, tackles the problem of daily hydro-generation scheduling (DHGS), and obtains the optimal hourly operation of cascade hydropower reservoirs. To meet the practical operational demands of power grid, an improved benefit-maximization model in which the peak shaving demands are taken as constraints is proposed for DHGS, and the joint peak load regulation (JPLR) method is applied to the proposed model. The model can enhance the power-generation efficiency and reduce the water spillage significantly under the condition of peak load regulation. Meanwhile, a hybrid method that combines discrete differential dynamic programming with progressive optimality algorithm is proposed to solve the JPLR problem. The complicated constraints can be handled by the proposed algorithm effectively. Moreover, the hydro-unit-commitment problem is solved by a rapid searching algorithm based on equal incremental principle and empirical methods. With this unit-commitment strategy, the computation speed can be accelerated and approximate optimal solutions can be obtained in a reasonable time frame. The proposed model and methods are applied to the DHGS of cascade hydro plants in Zagunao River in China and achieve good performance.
    publisherAmerican Society of Civil Engineers
    titleDaily Generation Scheduling of Cascade Hydro Plants Considering Peak Shaving Constraints
    typeJournal Paper
    journal volume142
    journal issue4
    journal titleJournal of Water Resources Planning and Management
    identifier doi10.1061/(ASCE)WR.1943-5452.0000622
    page04015072
    treeJournal of Water Resources Planning and Management:;2016:;Volume ( 142 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian