YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Pipeline Systems Engineering and Practice
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Pipeline Systems Engineering and Practice
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Jacking Force and Productivity Analysis of Pilot Tube Microtunneling Installations

    Source: Journal of Pipeline Systems Engineering and Practice:;2016:;Volume ( 007 ):;issue: 001
    Author:
    Matthew P. Olson
    ,
    Samuel T. Ariaratnam
    ,
    J. S. Lueke
    DOI: 10.1061/(ASCE)PS.1949-1204.0000215
    Publisher: American Society of Civil Engineers
    Abstract: Trenchless technology is a group of techniques whose utilization allows for the repair, rehabilitation, and installation of underground infrastructure with minimal excavation. Pilot tube microtunneling (PTMT) is a trenchless technology in which new wastewater pipelines may be installed at precise line and grade over manhole-to-manhole distances. Generally, PTMT is accomplished with the implementation of three distinct phases: (1) jacking of pilot tubes to achieve line and grade, (2) jacking of casing along the pilot bore and rotation of augers to excavate a borehole slightly larger than the product pipe, and (3) jacking of product pipe directly behind the last casing. Understanding the mechanisms affecting PTMT productivity rates and jacking forces is a valuable tool that can assist designers and contractors with risk abatement. This paper outlines the instrumentation and monitoring process used to record jacking frame hydraulic pressures during seven PTMT installations. Cyclic patterns detected in the data enable the productivity rates for each PTMT phase to be determined and critical tasks associated with each phase to be identified. Variations in depth of cover, drive length, pipe diameter, and localized ground conditions allow for trends in jacking forces to be recognized. Jacking force behavior throughout each drive was compared to existing jacking force predictive models developed for the closely related pipe jacking and microtunneling methodologies because there are no currently developed predictive models to represent PTMT installation behavior.
    • Download: (857.2Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Jacking Force and Productivity Analysis of Pilot Tube Microtunneling Installations

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4244295
    Collections
    • Journal of Pipeline Systems Engineering and Practice

    Show full item record

    contributor authorMatthew P. Olson
    contributor authorSamuel T. Ariaratnam
    contributor authorJ. S. Lueke
    date accessioned2017-12-30T12:59:42Z
    date available2017-12-30T12:59:42Z
    date issued2016
    identifier other%28ASCE%29PS.1949-1204.0000215.pdf
    identifier urihttp://138.201.223.254:8080/yetl1/handle/yetl/4244295
    description abstractTrenchless technology is a group of techniques whose utilization allows for the repair, rehabilitation, and installation of underground infrastructure with minimal excavation. Pilot tube microtunneling (PTMT) is a trenchless technology in which new wastewater pipelines may be installed at precise line and grade over manhole-to-manhole distances. Generally, PTMT is accomplished with the implementation of three distinct phases: (1) jacking of pilot tubes to achieve line and grade, (2) jacking of casing along the pilot bore and rotation of augers to excavate a borehole slightly larger than the product pipe, and (3) jacking of product pipe directly behind the last casing. Understanding the mechanisms affecting PTMT productivity rates and jacking forces is a valuable tool that can assist designers and contractors with risk abatement. This paper outlines the instrumentation and monitoring process used to record jacking frame hydraulic pressures during seven PTMT installations. Cyclic patterns detected in the data enable the productivity rates for each PTMT phase to be determined and critical tasks associated with each phase to be identified. Variations in depth of cover, drive length, pipe diameter, and localized ground conditions allow for trends in jacking forces to be recognized. Jacking force behavior throughout each drive was compared to existing jacking force predictive models developed for the closely related pipe jacking and microtunneling methodologies because there are no currently developed predictive models to represent PTMT installation behavior.
    publisherAmerican Society of Civil Engineers
    titleJacking Force and Productivity Analysis of Pilot Tube Microtunneling Installations
    typeJournal Paper
    journal volume7
    journal issue1
    journal titleJournal of Pipeline Systems Engineering and Practice
    identifier doi10.1061/(ASCE)PS.1949-1204.0000215
    page04015018
    treeJournal of Pipeline Systems Engineering and Practice:;2016:;Volume ( 007 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian