YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Risk Assessment and Early-Warning System for High-Speed Railway during the Construction and Operation of Underpass Bridges

    Source: Journal of Performance of Constructed Facilities:;2016:;Volume ( 030 ):;issue: 001
    Author:
    Wei He
    ,
    Yinlong Duan
    ,
    Liwen Deng
    ,
    Weiguang Zhou
    DOI: 10.1061/(ASCE)CF.1943-5509.0000717
    Publisher: American Society of Civil Engineers
    Abstract: Potential risk assessment and early-warning system are essentially important to ensure the safety of high-speed railway (HSR) bridges. This paper presents an in-depth methodology of this risk assessment and early warning. Firstly, the risk sources, occurrence probabilities, and hazard consequences were investigated by consulting specialists. For kernel-risk sources, such as excavation and dewater activities, finite-element models were established to evaluate the deformation of foundations and approach embankments in various conditions. Then, with combined quantitative and qualitative analysis, the as low as reasonably possible (ALARP) criterion was utilized to obtain the results of risk assessment. On the early-warning system, autoregressive integrated moving average (ARIMA) method was used to predict the continuous deformation and to analyze the kernel indices that may affect the railway operations. At last, the forewarning interval of each index that can be used in the construction monitoring was suggested. The proposed methods of risk assessment, settlement prediction, construction monitoring, and early-warning system have been successfully applied to the Cuiheng Road Underpass of the Beijing-Tianjin Intercity Railway and may be used in future similar projects. Practices have shown that these methods can effectively reduce risks, ensure structural safety, and maintain sustainable development.
    • Download: (10.03Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Risk Assessment and Early-Warning System for High-Speed Railway during the Construction and Operation of Underpass Bridges

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4244277
    Collections
    • Journal of Performance of Constructed Facilities

    Show full item record

    contributor authorWei He
    contributor authorYinlong Duan
    contributor authorLiwen Deng
    contributor authorWeiguang Zhou
    date accessioned2017-12-30T12:59:37Z
    date available2017-12-30T12:59:37Z
    date issued2016
    identifier other%28ASCE%29CF.1943-5509.0000717.pdf
    identifier urihttp://138.201.223.254:8080/yetl1/handle/yetl/4244277
    description abstractPotential risk assessment and early-warning system are essentially important to ensure the safety of high-speed railway (HSR) bridges. This paper presents an in-depth methodology of this risk assessment and early warning. Firstly, the risk sources, occurrence probabilities, and hazard consequences were investigated by consulting specialists. For kernel-risk sources, such as excavation and dewater activities, finite-element models were established to evaluate the deformation of foundations and approach embankments in various conditions. Then, with combined quantitative and qualitative analysis, the as low as reasonably possible (ALARP) criterion was utilized to obtain the results of risk assessment. On the early-warning system, autoregressive integrated moving average (ARIMA) method was used to predict the continuous deformation and to analyze the kernel indices that may affect the railway operations. At last, the forewarning interval of each index that can be used in the construction monitoring was suggested. The proposed methods of risk assessment, settlement prediction, construction monitoring, and early-warning system have been successfully applied to the Cuiheng Road Underpass of the Beijing-Tianjin Intercity Railway and may be used in future similar projects. Practices have shown that these methods can effectively reduce risks, ensure structural safety, and maintain sustainable development.
    publisherAmerican Society of Civil Engineers
    titleRisk Assessment and Early-Warning System for High-Speed Railway during the Construction and Operation of Underpass Bridges
    typeJournal Paper
    journal volume30
    journal issue1
    journal titleJournal of Performance of Constructed Facilities
    identifier doi10.1061/(ASCE)CF.1943-5509.0000717
    pageC4015003
    treeJournal of Performance of Constructed Facilities:;2016:;Volume ( 030 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian