YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Optimization of Deck Construction Staging for Multiple-Span Continuous Steel Girder Bridge

    Source: Journal of Performance of Constructed Facilities:;2018:;Volume ( 032 ):;issue: 001
    Author:
    Dan Su
    ,
    Hani Nassif
    ,
    Ye Xia
    DOI: 10.1061/(ASCE)CF.1943-5509.0001073
    Publisher: American Society of Civil Engineers
    Abstract: Cracking in concrete deck has been the major concern to bridge designers as well as owners. Excessive cracking not only would affect the performance and serviceability of the bridge but also reduce the service life of the concrete deck and increase the maintenance cost. It is proven that many factors could cause the cracking of concrete deck including restrained shrinkage, temperature effects, applied live load, and improper construction sequence. Among these factors, appropriate construction staging plays an important role in minimizing the cracking of concrete deck, especially for multiple span continuous bridges. However, the construction staging has not been subjected to detailed research in the past. Therefore, it is important to evaluate the current concrete deck construction staging practice and propose an optimized construction staging for multiple span continuous bridges, if needed. In this study, the research approach adopted is aimed at investigating the cracking of a typical multiple-span continuous bridge, evaluating the construction staging, and providing an optimized practice for deck construction staging. A typical three-span continuous bridge was selected for investigation and various types of sensors were instrumented on the bridge to monitor the behavior of the structure during and after construction. The finite-element (FE) model was developed and validated with the data collected from field testing. Based on FE analysis and experimental data, the cracking of the bridge deck was investigated and alternative construction staging scenarios were simulated and compared. Moreover, based on analysis results, an optimized deck construction staging practice was recommended for future use.
    • Download: (1.760Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Optimization of Deck Construction Staging for Multiple-Span Continuous Steel Girder Bridge

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4244232
    Collections
    • Journal of Performance of Constructed Facilities

    Show full item record

    contributor authorDan Su
    contributor authorHani Nassif
    contributor authorYe Xia
    date accessioned2017-12-30T12:59:26Z
    date available2017-12-30T12:59:26Z
    date issued2018
    identifier other%28ASCE%29CF.1943-5509.0001073.pdf
    identifier urihttp://138.201.223.254:8080/yetl1/handle/yetl/4244232
    description abstractCracking in concrete deck has been the major concern to bridge designers as well as owners. Excessive cracking not only would affect the performance and serviceability of the bridge but also reduce the service life of the concrete deck and increase the maintenance cost. It is proven that many factors could cause the cracking of concrete deck including restrained shrinkage, temperature effects, applied live load, and improper construction sequence. Among these factors, appropriate construction staging plays an important role in minimizing the cracking of concrete deck, especially for multiple span continuous bridges. However, the construction staging has not been subjected to detailed research in the past. Therefore, it is important to evaluate the current concrete deck construction staging practice and propose an optimized construction staging for multiple span continuous bridges, if needed. In this study, the research approach adopted is aimed at investigating the cracking of a typical multiple-span continuous bridge, evaluating the construction staging, and providing an optimized practice for deck construction staging. A typical three-span continuous bridge was selected for investigation and various types of sensors were instrumented on the bridge to monitor the behavior of the structure during and after construction. The finite-element (FE) model was developed and validated with the data collected from field testing. Based on FE analysis and experimental data, the cracking of the bridge deck was investigated and alternative construction staging scenarios were simulated and compared. Moreover, based on analysis results, an optimized deck construction staging practice was recommended for future use.
    publisherAmerican Society of Civil Engineers
    titleOptimization of Deck Construction Staging for Multiple-Span Continuous Steel Girder Bridge
    typeJournal Paper
    journal volume32
    journal issue1
    journal titleJournal of Performance of Constructed Facilities
    identifier doi10.1061/(ASCE)CF.1943-5509.0001073
    page04017124
    treeJournal of Performance of Constructed Facilities:;2018:;Volume ( 032 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian