YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Design and Field Monitoring of Piled Raft Foundations with Deformation Adjustors

    Source: Journal of Performance of Constructed Facilities:;2016:;Volume ( 030 ):;issue: 006
    Author:
    Feng Zhou
    ,
    Cheng Lin
    ,
    Feng Zhang
    ,
    Shu-Zhi Lin
    ,
    Xu-Dong Wang
    DOI: 10.1061/(ASCE)CF.1943-5509.0000917
    Publisher: American Society of Civil Engineers
    Abstract: This paper presents a case study of applying a new device termed deformation adjustor in piled raft foundations to support a high-rise building. The deformation adjustors are mounted on a pile head to optimize load distribution of a piled raft foundation so that a relatively uniform foundation deformation can be achieved in complicated load, construction, and soil conditions. In this case study, the project site is located in a coastal city in China, featuring complicated subsurface soil conditions with abundant large boulders. The project was put on hold for a decade because in the complicated soil conditions the piles could not be installed to the required depths. The project resumed with introduction of deformation adjustors which helped to shift the applied loads from piles to subsoil below the raft and thus considerably reduced the pile lengths. This case study describes the preliminary design of pile-raft foundations with deformation adjustors, followed by a comprehensive monitoring program for settlements, earth pressures, and pile top reaction forces during and after building construction. Based on the long-term monitoring, subsoil below the raft was able to bear 83% of total applied loads, whereas the piles carried 17% of the loads. Based on this case study, deformation adjustors were proved to be an effective and economical solution for piled raft foundations to support high-rise buildings in complicated subsurface conditions.
    • Download: (5.675Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Design and Field Monitoring of Piled Raft Foundations with Deformation Adjustors

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4244176
    Collections
    • Journal of Performance of Constructed Facilities

    Show full item record

    contributor authorFeng Zhou
    contributor authorCheng Lin
    contributor authorFeng Zhang
    contributor authorShu-Zhi Lin
    contributor authorXu-Dong Wang
    date accessioned2017-12-30T12:59:08Z
    date available2017-12-30T12:59:08Z
    date issued2016
    identifier other%28ASCE%29CF.1943-5509.0000917.pdf
    identifier urihttp://138.201.223.254:8080/yetl1/handle/yetl/4244176
    description abstractThis paper presents a case study of applying a new device termed deformation adjustor in piled raft foundations to support a high-rise building. The deformation adjustors are mounted on a pile head to optimize load distribution of a piled raft foundation so that a relatively uniform foundation deformation can be achieved in complicated load, construction, and soil conditions. In this case study, the project site is located in a coastal city in China, featuring complicated subsurface soil conditions with abundant large boulders. The project was put on hold for a decade because in the complicated soil conditions the piles could not be installed to the required depths. The project resumed with introduction of deformation adjustors which helped to shift the applied loads from piles to subsoil below the raft and thus considerably reduced the pile lengths. This case study describes the preliminary design of pile-raft foundations with deformation adjustors, followed by a comprehensive monitoring program for settlements, earth pressures, and pile top reaction forces during and after building construction. Based on the long-term monitoring, subsoil below the raft was able to bear 83% of total applied loads, whereas the piles carried 17% of the loads. Based on this case study, deformation adjustors were proved to be an effective and economical solution for piled raft foundations to support high-rise buildings in complicated subsurface conditions.
    publisherAmerican Society of Civil Engineers
    titleDesign and Field Monitoring of Piled Raft Foundations with Deformation Adjustors
    typeJournal Paper
    journal volume30
    journal issue6
    journal titleJournal of Performance of Constructed Facilities
    identifier doi10.1061/(ASCE)CF.1943-5509.0000917
    page04016057
    treeJournal of Performance of Constructed Facilities:;2016:;Volume ( 030 ):;issue: 006
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian