YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Management-Reserve Estimation for International Construction Projects Based on Risk-Informed k-NN

    Source: Journal of Management in Engineering:;2017:;Volume ( 033 ):;issue: 004
    Author:
    Kwang-Pyo Lee
    ,
    Hyun-Soo Lee
    ,
    Moonseo Park
    ,
    Du Yon Kim
    ,
    Minhyuk Jung
    DOI: 10.1061/(ASCE)ME.1943-5479.0000510
    Publisher: American Society of Civil Engineers
    Abstract: International construction projects normally involve high levels of risk. To reduce such risk, contractors typically include a reserve to mitigate cost overruns and schedule delays. This reserve comprises two categories: (1) a contingency reserve covering potentially required changes, and (2) a management reserve (MR) covering unplanned changes. Since estimating an MR is difficult because the inherent risks are unpredictable, the traditional percentage method is still used for this purpose. To address this shortcoming, this study proposes an MR estimation method based on the cost and schedule performance ratios of international construction projects. K-nearest neighbor (k-NN) is applied to retrieve similar projects and a genetic algorithm is adopted to optimize the retrieved cases. Finally, case studies are conducted to validate the estimated ratios and test the applicability of the proposed MR estimation method. The case study results show that the proposed method can infer the cost and schedule performance ratios within a 5% error rate. As a result, it can estimate the MR more accurately than the traditional percentage method.
    • Download: (573.8Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Management-Reserve Estimation for International Construction Projects Based on Risk-Informed k-NN

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4243785
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorKwang-Pyo Lee
    contributor authorHyun-Soo Lee
    contributor authorMoonseo Park
    contributor authorDu Yon Kim
    contributor authorMinhyuk Jung
    date accessioned2017-12-30T12:56:55Z
    date available2017-12-30T12:56:55Z
    date issued2017
    identifier other%28ASCE%29ME.1943-5479.0000510.pdf
    identifier urihttp://138.201.223.254:8080/yetl1/handle/yetl/4243785
    description abstractInternational construction projects normally involve high levels of risk. To reduce such risk, contractors typically include a reserve to mitigate cost overruns and schedule delays. This reserve comprises two categories: (1) a contingency reserve covering potentially required changes, and (2) a management reserve (MR) covering unplanned changes. Since estimating an MR is difficult because the inherent risks are unpredictable, the traditional percentage method is still used for this purpose. To address this shortcoming, this study proposes an MR estimation method based on the cost and schedule performance ratios of international construction projects. K-nearest neighbor (k-NN) is applied to retrieve similar projects and a genetic algorithm is adopted to optimize the retrieved cases. Finally, case studies are conducted to validate the estimated ratios and test the applicability of the proposed MR estimation method. The case study results show that the proposed method can infer the cost and schedule performance ratios within a 5% error rate. As a result, it can estimate the MR more accurately than the traditional percentage method.
    publisherAmerican Society of Civil Engineers
    titleManagement-Reserve Estimation for International Construction Projects Based on Risk-Informed k-NN
    typeJournal Paper
    journal volume33
    journal issue4
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)ME.1943-5479.0000510
    page04017002
    treeJournal of Management in Engineering:;2017:;Volume ( 033 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian