YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Predicting Contract Duration for Building Construction: Is Bromilow’s Time-Cost Model a Panacea?

    Source: Journal of Management in Engineering:;2016:;Volume ( 032 ):;issue: 001
    Author:
    Abdulaziz M. Jarkas
    DOI: 10.1061/(ASCE)ME.1943-5479.0000394
    Publisher: American Society of Civil Engineers
    Abstract: To predict project duration with reasonable accuracy is a problem of continual concern and interest to researchers and industry practitioners. Consequently, several research studies have focused on this subject, and thus multiple models have been developed. Notwithstanding the conflicting findings of its predictive veracity, the 45-year-old “time-cost” model of Bromilow remains the baseline, to which the outcomes of most developed models are compared. However, the applicability of the original time-cost model to the construction industry in the State of Kuwait is yet to be determined. The objectives of this case study, therefore, are to examine the validity, and hence the applicability, of the time-cost model to estimate contract durations for building construction in the State, and to propose an alternative model, taking into consideration other potentially influential project scope variables on time performance. To this end, relevant data for 113 residential and 74 office buildings, which were completed during the period 2004–2010, were collected by a questionnaire survey and subsequently analyzed using both the time-cost model and a multiple linear regression model comprising the project construction area as well as the number of floors above and below ground. While the results obtained further affirm the predictive ability of Bromilow’s time-cost model, a comparison between the outcomes of both models tested demonstrates that, on average, the multifactor model proposed is associated with an enhanced prediction accuracy of 16 and 14% for residential and office buildings, respectively, and therefore can be deemed more suitable for forecasting local construction duration for the building types investigated.
    • Download: (164.3Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Predicting Contract Duration for Building Construction: Is Bromilow’s Time-Cost Model a Panacea?

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4243760
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorAbdulaziz M. Jarkas
    date accessioned2017-12-30T12:56:50Z
    date available2017-12-30T12:56:50Z
    date issued2016
    identifier other%28ASCE%29ME.1943-5479.0000394.pdf
    identifier urihttp://138.201.223.254:8080/yetl1/handle/yetl/4243760
    description abstractTo predict project duration with reasonable accuracy is a problem of continual concern and interest to researchers and industry practitioners. Consequently, several research studies have focused on this subject, and thus multiple models have been developed. Notwithstanding the conflicting findings of its predictive veracity, the 45-year-old “time-cost” model of Bromilow remains the baseline, to which the outcomes of most developed models are compared. However, the applicability of the original time-cost model to the construction industry in the State of Kuwait is yet to be determined. The objectives of this case study, therefore, are to examine the validity, and hence the applicability, of the time-cost model to estimate contract durations for building construction in the State, and to propose an alternative model, taking into consideration other potentially influential project scope variables on time performance. To this end, relevant data for 113 residential and 74 office buildings, which were completed during the period 2004–2010, were collected by a questionnaire survey and subsequently analyzed using both the time-cost model and a multiple linear regression model comprising the project construction area as well as the number of floors above and below ground. While the results obtained further affirm the predictive ability of Bromilow’s time-cost model, a comparison between the outcomes of both models tested demonstrates that, on average, the multifactor model proposed is associated with an enhanced prediction accuracy of 16 and 14% for residential and office buildings, respectively, and therefore can be deemed more suitable for forecasting local construction duration for the building types investigated.
    publisherAmerican Society of Civil Engineers
    titlePredicting Contract Duration for Building Construction: Is Bromilow’s Time-Cost Model a Panacea?
    typeJournal Paper
    journal volume32
    journal issue1
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)ME.1943-5479.0000394
    page05015004
    treeJournal of Management in Engineering:;2016:;Volume ( 032 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian