YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Evaluating the Impact of Bridge-Deck Removal on the Performance of Precast/Prestressed Concrete I-Girders

    Source: Journal of Performance of Constructed Facilities:;2016:;Volume ( 030 ):;issue: 003
    Author:
    Shaddi A. Assad
    ,
    George Morcous
    DOI: 10.1061/(ASCE)CF.1943-5509.0000769
    Publisher: American Society of Civil Engineers
    Abstract: Precast/prestressed concrete I-girders with wide and thin top flanges have been widely used by several transportation agencies in the last two decades. These girders have many advantages, such as accommodating a large number of prestressing strands, having a reduced girder weight, and providing greater stability in construction and an adequate platform for workers. Despite these advantages, the wide and thin top flange might be disadvantageous when it comes to deck removal, as it is more susceptible to damage. In this paper, the impact of deck removal on the performance of supporting girders is investigated. Two methods, saw-cutting and jackhammering, were implemented on the Camp Creek Bridge over I-80 in Lancaster County, Nebraska, before demolition due to its functional obsolesces. Different saw-cutting and jackhammering techniques were performed for deck removal between girders and on top of girder flange. Also, two girders from the bridge were taken to the lab for structural testing after applying different deck removal methods and redecking. Test results indicated adequate performance of the girder with reduced flange width even when partial deck removal around shear connectors is applied. Also, an analytical investigation was conducted to evaluate the effect of top flange width on the performance of bridge I-girders under service and ultimate loads. Investigation results indicate that in several cases top flange width does not have a significant impact on the structural performance of I-girders.
    • Download: (8.941Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Evaluating the Impact of Bridge-Deck Removal on the Performance of Precast/Prestressed Concrete I-Girders

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4241554
    Collections
    • Journal of Performance of Constructed Facilities

    Show full item record

    contributor authorShaddi A. Assad
    contributor authorGeorge Morcous
    date accessioned2017-12-16T09:20:03Z
    date available2017-12-16T09:20:03Z
    date issued2016
    identifier other%28ASCE%29CF.1943-5509.0000769.pdf
    identifier urihttp://138.201.223.254:8080/yetl1/handle/yetl/4241554
    description abstractPrecast/prestressed concrete I-girders with wide and thin top flanges have been widely used by several transportation agencies in the last two decades. These girders have many advantages, such as accommodating a large number of prestressing strands, having a reduced girder weight, and providing greater stability in construction and an adequate platform for workers. Despite these advantages, the wide and thin top flange might be disadvantageous when it comes to deck removal, as it is more susceptible to damage. In this paper, the impact of deck removal on the performance of supporting girders is investigated. Two methods, saw-cutting and jackhammering, were implemented on the Camp Creek Bridge over I-80 in Lancaster County, Nebraska, before demolition due to its functional obsolesces. Different saw-cutting and jackhammering techniques were performed for deck removal between girders and on top of girder flange. Also, two girders from the bridge were taken to the lab for structural testing after applying different deck removal methods and redecking. Test results indicated adequate performance of the girder with reduced flange width even when partial deck removal around shear connectors is applied. Also, an analytical investigation was conducted to evaluate the effect of top flange width on the performance of bridge I-girders under service and ultimate loads. Investigation results indicate that in several cases top flange width does not have a significant impact on the structural performance of I-girders.
    publisherAmerican Society of Civil Engineers
    titleEvaluating the Impact of Bridge-Deck Removal on the Performance of Precast/Prestressed Concrete I-Girders
    typeJournal Paper
    journal volume30
    journal issue3
    journal titleJournal of Performance of Constructed Facilities
    identifier doi10.1061/(ASCE)CF.1943-5509.0000769
    treeJournal of Performance of Constructed Facilities:;2016:;Volume ( 030 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian