YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Identifying and Prioritizing Best Practices to Achieve Flash Track Projects

    Source: Journal of Construction Engineering and Management:;2016:;Volume ( 142 ):;issue: 002
    Author:
    Robert B. Austin
    ,
    Pardis Pishdad-Bozorgi
    ,
    Jesus M. de la Garza
    DOI: 10.1061/(ASCE)CO.1943-7862.0001061
    Publisher: American Society of Civil Engineers
    Abstract: This paper presents the initial findings of an ongoing research effort focused on identifying, quantifying, and ranking essential industry practices for the successful delivery of faster fast-track, or Flash Track, projects. The research data collection involves literature search, engineering, procurement, construction industry interviews, and discussions with an industry expert panel. This research has extensively explored and analyzed U.S. and international practices and has deeply explored project execution practices in industries other than construction, including manufacturing, shipbuilding, and software engineering/development. The methodology employed in this research entails deployment of a three-round Delphi process and an Analytic Hierarchy Process to produce a comprehensive list of prioritized recommendations on essential Flash Track practices. This paper contributes to the body of knowledge by identifying and ranking 18 industry best practices essential to successfully manage the unique challenges and risks inherent in Flash Track projects. This research finds that planning, execution, and organizational practices are the most essential considerations for successful Flash Tracking. It also highlights the central role of trusting relationships and fully integrated work teams and, in doing so, extends earlier studies calling for innovative approaches, rethinking prevailing practices, and entertaining a new paradigm in Flash Track projects.
    • Download: (331.1Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Identifying and Prioritizing Best Practices to Achieve Flash Track Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4241364
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorRobert B. Austin
    contributor authorPardis Pishdad-Bozorgi
    contributor authorJesus M. de la Garza
    date accessioned2017-12-16T09:18:59Z
    date available2017-12-16T09:18:59Z
    date issued2016
    identifier other%28ASCE%29CO.1943-7862.0001061.pdf
    identifier urihttp://138.201.223.254:8080/yetl1/handle/yetl/4241364
    description abstractThis paper presents the initial findings of an ongoing research effort focused on identifying, quantifying, and ranking essential industry practices for the successful delivery of faster fast-track, or Flash Track, projects. The research data collection involves literature search, engineering, procurement, construction industry interviews, and discussions with an industry expert panel. This research has extensively explored and analyzed U.S. and international practices and has deeply explored project execution practices in industries other than construction, including manufacturing, shipbuilding, and software engineering/development. The methodology employed in this research entails deployment of a three-round Delphi process and an Analytic Hierarchy Process to produce a comprehensive list of prioritized recommendations on essential Flash Track practices. This paper contributes to the body of knowledge by identifying and ranking 18 industry best practices essential to successfully manage the unique challenges and risks inherent in Flash Track projects. This research finds that planning, execution, and organizational practices are the most essential considerations for successful Flash Tracking. It also highlights the central role of trusting relationships and fully integrated work teams and, in doing so, extends earlier studies calling for innovative approaches, rethinking prevailing practices, and entertaining a new paradigm in Flash Track projects.
    publisherAmerican Society of Civil Engineers
    titleIdentifying and Prioritizing Best Practices to Achieve Flash Track Projects
    typeJournal Paper
    journal volume142
    journal issue2
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0001061
    treeJournal of Construction Engineering and Management:;2016:;Volume ( 142 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian