YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Impact of Team Integration and Group Cohesion on Project Delivery Performance

    Source: Journal of Construction Engineering and Management:;2017:;Volume ( 143 ):;issue: 001
    Author:
    Bryan Franz
    ,
    Robert Leicht
    ,
    Keith Molenaar
    ,
    John Messner
    DOI: 10.1061/(ASCE)CO.1943-7862.0001219
    Publisher: American Society of Civil Engineers
    Abstract: The architecture, engineering, and construction (AEC) industry is often criticized for its fragmented approach to project delivery. Traditional procurement and contracting intentionally serves to isolate designers from contractors to provide checks and balances, but limits opportunities for collaboration. This research presents a structural modeling approach to studying the role of integration in the performance of building construction projects. A sample data set of 204 completed projects was collected to compare cost, schedule, and quality performance under different delivery methods. Integration of project teams was proposed and tested in the form of two latent constructs—team integration and group cohesion—that mediate the link between delivery methods and performance. More integrated teams interacted with more participants from all levels of the building construction process, from designers to specialty trade contractors. These interactions included design charrettes, joint goal setting, and multidisciplinary building information modeling (BIM) uses. The selected project delivery method had a significant effect on team integration. Delivery methods that involved the builder and specialty trade contractors before schematic design achieved higher levels of integration and were more equipped to control project schedule growth. Cohesive teams were characterized by better chemistry, goal commitment, and timeliness of communication. Project delivery methods that included cost transparency with open-book contracts and qualification-based selection of the builder resulted in more cohesive teams and a lower average project cost growth. Additionally, the owner’s perception of their turnover experience and building system quality was rated higher for cohesive teams. Understanding how delivery decisions influence the integration and development of their project teams will make building owners more aware of how those decisions ultimately affect the project’s performance.
    • Download: (1.255Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Impact of Team Integration and Group Cohesion on Project Delivery Performance

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4241282
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorBryan Franz
    contributor authorRobert Leicht
    contributor authorKeith Molenaar
    contributor authorJohn Messner
    date accessioned2017-12-16T09:18:39Z
    date available2017-12-16T09:18:39Z
    date issued2017
    identifier other%28ASCE%29CO.1943-7862.0001219.pdf
    identifier urihttp://138.201.223.254:8080/yetl1/handle/yetl/4241282
    description abstractThe architecture, engineering, and construction (AEC) industry is often criticized for its fragmented approach to project delivery. Traditional procurement and contracting intentionally serves to isolate designers from contractors to provide checks and balances, but limits opportunities for collaboration. This research presents a structural modeling approach to studying the role of integration in the performance of building construction projects. A sample data set of 204 completed projects was collected to compare cost, schedule, and quality performance under different delivery methods. Integration of project teams was proposed and tested in the form of two latent constructs—team integration and group cohesion—that mediate the link between delivery methods and performance. More integrated teams interacted with more participants from all levels of the building construction process, from designers to specialty trade contractors. These interactions included design charrettes, joint goal setting, and multidisciplinary building information modeling (BIM) uses. The selected project delivery method had a significant effect on team integration. Delivery methods that involved the builder and specialty trade contractors before schematic design achieved higher levels of integration and were more equipped to control project schedule growth. Cohesive teams were characterized by better chemistry, goal commitment, and timeliness of communication. Project delivery methods that included cost transparency with open-book contracts and qualification-based selection of the builder resulted in more cohesive teams and a lower average project cost growth. Additionally, the owner’s perception of their turnover experience and building system quality was rated higher for cohesive teams. Understanding how delivery decisions influence the integration and development of their project teams will make building owners more aware of how those decisions ultimately affect the project’s performance.
    publisherAmerican Society of Civil Engineers
    titleImpact of Team Integration and Group Cohesion on Project Delivery Performance
    typeJournal Paper
    journal volume143
    journal issue1
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0001219
    treeJournal of Construction Engineering and Management:;2017:;Volume ( 143 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian