YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Arch First and Beam Later: Arch-Rib Integral Installation Construction Technology for Large-Span Tied-Arch Bridge

    Source: Journal of Construction Engineering and Management:;2017:;Volume ( 143 ):;issue: 008
    Author:
    Wenxiang Xie
    ,
    Tingsheng Zhao
    ,
    Jingjing Tang
    ,
    Yong Zhang
    DOI: 10.1061/(ASCE)CO.1943-7862.0001356
    Publisher: American Society of Civil Engineers
    Abstract: Tied-arch bridges are usually constructed using the beam first and arch later method, which enjoys the advantages of a short construction period and ease with which quality control can be achieved. However, when tied-arch bridges are constructed over roads or navigation channels, the construction will inevitably interrupt traffic, preventing the beam first and arch later construction from being realized. Therefore, this study investigates the arch-rib integral installation for the arch first and beam later method. The advantages and disadvantages of the conventional cable and arch-rib hoisting method are analyzed; further, this paper proposes the assembly of the arch rib on one side of the bridge, and the installation of the arch rib using a floating crane in a single step. Owing to the decreased cost, time saving, and ease of quality control, the horizontal installation method was preferentially adopted during arch-rib integral installation. Concreting at the arched beam area of the tie bar was conducted using Berea pieces assembled on a sling hanging basket, which can be repeatedly used to reduce the construction cost. Results obtained show that the arch first and beam later construction method is feasible.
    • Download: (715.5Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Arch First and Beam Later: Arch-Rib Integral Installation Construction Technology for Large-Span Tied-Arch Bridge

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4241171
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorWenxiang Xie
    contributor authorTingsheng Zhao
    contributor authorJingjing Tang
    contributor authorYong Zhang
    date accessioned2017-12-16T09:18:17Z
    date available2017-12-16T09:18:17Z
    date issued2017
    identifier other%28ASCE%29CO.1943-7862.0001356.pdf
    identifier urihttp://138.201.223.254:8080/yetl1/handle/yetl/4241171
    description abstractTied-arch bridges are usually constructed using the beam first and arch later method, which enjoys the advantages of a short construction period and ease with which quality control can be achieved. However, when tied-arch bridges are constructed over roads or navigation channels, the construction will inevitably interrupt traffic, preventing the beam first and arch later construction from being realized. Therefore, this study investigates the arch-rib integral installation for the arch first and beam later method. The advantages and disadvantages of the conventional cable and arch-rib hoisting method are analyzed; further, this paper proposes the assembly of the arch rib on one side of the bridge, and the installation of the arch rib using a floating crane in a single step. Owing to the decreased cost, time saving, and ease of quality control, the horizontal installation method was preferentially adopted during arch-rib integral installation. Concreting at the arched beam area of the tie bar was conducted using Berea pieces assembled on a sling hanging basket, which can be repeatedly used to reduce the construction cost. Results obtained show that the arch first and beam later construction method is feasible.
    publisherAmerican Society of Civil Engineers
    titleArch First and Beam Later: Arch-Rib Integral Installation Construction Technology for Large-Span Tied-Arch Bridge
    typeJournal Paper
    journal volume143
    journal issue8
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0001356
    treeJournal of Construction Engineering and Management:;2017:;Volume ( 143 ):;issue: 008
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian